Engineering Disciplines Flashcards

1
Q

System Engineering Plan (SEP)

A

Submitted at each major milestone. Outlines technical risks, processes, resources, organizations, metrics, and design
Details integration with existing capes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the 8 technical processes used to execute the overall System Engineering Process?

A

1) Stakeholder Requirements Definition
2) Requirements Analysis
3) Architecture Design
4) Transition
5) Validation
6) Verification
7) Integration
8) Implementation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What does the Stakeholder Requirements Definition step do?

A

Captures requirements, expectations, and contraints

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What does the Requirements Analysis step do?

A

Translates needs into high-level requirements and functions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What does the Architecture Design step do?

A

Creates the system model, document, or digital representation that captures operational and functional requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What does the Implementation step do?

A

The production procedures of forming, joining, and finishing, or coding for software with the output of physical system elements defined

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What does the Integration step do?

A

Systematically assembles lower level elements into higher levels.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What does the Verification step do?

A

Assures that it meets specification. involves developmental testing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What does the Validation step do?

A

Provides Objective evidence complies with stakeholder performance requirements in its intended operational environment

Operational effectiveness, suitability, sustainability, and survivability measured

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What does the Transition step do?

A

Deploys the system and integrates accessories and support equipment in the Operational Environment.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the 8 technical management processes?

A

Decision Analysis
Technical Planning
Technical Assessment
Requirements Management
Risk Management
Configuration Management
Technical Data Management
Interface Management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What does the Decision Analysis process do?

A

Helps transform a decision opportunity into a tracible, defendable, and actionable plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What does the Technical Planning Process do?

A

Defines the scope of technical effort required to develop, field, and sustain
Defined in the SEP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What does the Technical Assessment Process do?

A

Allows Acquisitions workforce to compare achieved results against defined criteria, measure technical progress, and the efficacy of plans and requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What does the Requirements Management Process do?

A

Tracks requirements changes and maintains traceability of end users needs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What does the Risk Management Process do?

A

Critical to mitigate program uncertainties, and keep cost, schedule, and performance goals

17
Q

What does the Configuration Management Process do?

A

Tracks and documents design changes

18
Q

What does the Technical Date Management Process do?

A

Identifies, acquires, manages, and maintains technical data and software

19
Q

What does the Interface Management Process do?

A

Ensures compliance and that all changes are documented within configurations management plan

20
Q

Which disciplines support Systems Engineering Process?

A

1) System Engineering
2) Science & Technology
3) Test & Eval
4) Life Cycle Logistics
Production, Quality & Manufacturing
5) Software Engineering
6) Cyber Security

21
Q

What System Engineering activities are involved in Material Solutions Analysis (MSA) ?

A

Translates viable concepts into designs
Inputs capability needs and assesses tech opportunities and status and the output from any efforts undertaken to explore solutions

22
Q

What System Engineering activities are involved in Technology Maturation and Risk Reduction (TMRR)?

A

Model/sim testing
Ensuring key tech and system components and understood and mature
conduct research and development activities with RDTE appropriation
Demonstrates critical tech on prototypes

23
Q

What System Engineering activities are involved in Engineering and Manufacturing Development (EMD)

A

stabilization of system-evel requirements and development of detailed designs
Extensive developmental, operational, and live fire testing
Fabrication of production representative articles
Demonstration of system in operationally intended environments

24
Q

What System Engineering activities are involved in Production and Deployment?

A

Produce min quality of articles necessary for IOT&E and LFT&E
Permit orderly increase in production rate
Establish an initial production base for the system