engineering Flashcards

1
Q

COLD IRON?

A

SHORE SERVICES.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

AUXILIARY STEAMING?

A

AT ANCHOR, FOREIGN PORTS, @ LEAST I GTG ONLINE.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

FULL POWER?

A

4 ENGINES. 30+ KNOTS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

SPLIT PLANT?

A

1 ENGINE PER SHAFT ONLINE, 27 KNOTS MAX.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

TRAIL SHAFT?

A

1 SHAFT POWERED, 20 KNOTS MAX.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

LOCKED SHAFT?

A

MRG/ SHAFT CASUALTY 12 KNOTS.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

EMERGENCY AHEAD PITCH?

A

MANUAL PUMP,12 KNOTS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

PURPOSE OF SHIPS SERVICE 60/400 Hz ELECTRICAL DISTRIBUTION SYSTEM?

A

SUPPLY SHIP WITH POWER.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

PURPOSE OF AUTOMATIC LOAD SHED FEATURE?

A

PROTECT FORWARD POWER FROM OVERPOWERING BY INITIATING STAGE 1 LOAD SHED( 2750 KWATTS FOR A PERIOD OF 100 MILLISECONDS) AND STAGE TWO ( 2750 FRO PERIOD OF 5 SECONDS.) THE MULTIFUNCTION MONITOR DOES THIS.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

SSGTG?

A

SHIPS SERVICE TURBINE GENERATOR. PRIME MOVERS, ELECTRICITY. THERE ARE 3. AUX 1, MER2, #3 GTG.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

SHIPS SERVICE SWITCHBOARDS?

A

?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

LOAD CENTERS

A

RECEIVE ELECTRICITY FROM SWITCHBOARDS FOR POWER DISTRIBUTION.15. CSER1, SHIPS OFFICE,AMER1,SWND1/CMC OFFICE.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

ELECTRIC POWER PLANT CONSOLE?

A

CENTRAL. [PROVIDES REMOTE STARTING/STOPPING OF GTGS,APU,AND REMOTELY CONTROLS ALL GENERATOR CIRCUIT BREAKERS.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

SHORE POWER SWITHBOARDS?

A

MAIN 2, MONITOR SHORT POWER LOCALLY.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

APD?

A

AUTOMATIC PARALLELING DEVICE. I IN EACH SWITCHBOARD PARALLEL.???

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

400 Hz CONVERTERS?

A

2 FWD/AT CONVERT 60 HERTZ TO 40.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

400 Hz SWITCHBOARDS?

A

MONITOR 400 HERTZ (2)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

400Hz REMOTE CONTROL PANEL?

A

CSMC.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

SHORE POWER TERMINALS?

A

12 MISSHIPS, USE 10 @ A TIME 2 ARE FOR SPARES.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

ENGINEERING OFFICER OF THE WATCH/ LOGGER UNIT?

A

EOOW/LU CENTRAL, DEALS WITH ALL THE ALARMS.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

PROPULSION AUXILIARY CONTROL CONSOLE?

A

PACC. GTM, ENGINES THAT DRIVE BOAT, FUEL ETC. IN CCS, PROVIDE LOCAL CONTROL OF SCUS VIA FODMS.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

SHAFT CONTROL UNIT ?

A

SCU. (2) MER1, MER2. MONITERS ALL VITAL SYSTEMS FOR PROPULSION PLANT OPERATIONS VIA HARDWIRED CONNECTIONS.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

ELECTRIC PLANT CONTROL/CONSOLE?

A

CONTROLS ALL THREE GTGS, CIRCUTS BREAKERS, CAPABLE OF STARTING/STOPPING APUS. IN CCS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

DAMAGE CONTROL CONSOLE?

A

DCC.CONTROLS FIREMAIN AND FIRE PUMPS.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

LOCAL OPERATING CONTROL PANEL?

A

LOCOP. (31) GTG. START GENERATORS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

NO BREAK POWER SUPPLY?

A

GENERATOR. POWER TO LOCOP/SWITCHBOARD.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

INTEGRATED CONDITON ASSESMENT SYSTEM?

A

ICAS. (2) MER1, CENTRAL.

28
Q

UNINTERPRETABLE POWER SUPPLY?

A

BACK UP BATTERY. 30-45 MINUTES .

29
Q

PRIORITY OF GAS TURBINE GENERATOR CONTROL FROM ENGINE ROOM TO BRIDGE?

A

ENGINEERING IS THE LOCAL CONTROL> (PACC) PROPULSION AUX CONTROL CONSOLE> BRIDE.

30
Q

FUNCTION OF FODMS?

A

WHAT MAKES CONSOLES TALK TO EACHOTHER.

31
Q

INPUT/OUTPUT UNIT?

A

GETS INPUT , SENDS OUT PROPULSION.

32
Q

TYPES OF FUEL ON SHIP AND THEIR USES?

A

DFM(F76)-PRIMARY -GTGS,GTM,RHIBS. STATION 3&4.

JP5- HELOS,EMERGENCY FOR GTMS/GTGS. STATION 7+8

33
Q

PURPOSE OF FUEL OIL(F/O) SERVICE SYSTEM?

A

PROVIDE CLEAN, FILTERED FUEL TO FOUR GTMS AND 3 GTGS. THERE ARE TWO F/O SYSTEMS LOCATED IN EACH ENGINE ROOM.CANNOT BE CROSSCONNNECTED.

34
Q

FUEL OIL SERVICE PUMPS?

A

2 PER ENGINE ROOM. PROVIDE FUEL, VOLUME AND PRESSURE.

35
Q

PREFILTERS( F/O)?

A

2 PER ENGINE ROOM. FILTER LARGE PRESSURIZED FUEL.

36
Q

COALESCER (F/O)?

A

FILTERS OUT WATER AND SEDIMENT.

37
Q

(F/O) SERVICE HEATERS?

A

HEAT FUEL AND PREVENT WAXING. 3. MAIN 1 AND 2 AND # 3 GEN.

38
Q

(F/0) EMERGENCY TRIP HANDLES/VALVES?

A

SHUT SUPPLY OF FUEL OFF QUICKLY. FOUR PER ENGINE ROOM (8) YELLOW HANDLE.

39
Q

F/O FILL AND TRANSFER SYSTEM?

A

MOVE FUEL FROM STORAGE TANK TO FUEL SERVICE TANK THROUGH THE HEATER AND PURIFIER.

40
Q

TRANSFER CONTINUES? F/O?

A

FUEL OIL PURIFIER- CENTRIFUGAL TYPE, CLEANS FUEL TYPE, 1 IN MAIN 1, 2 IN MAIN 2.
TRANSFER PUMPS- USED FOR SUCTION OF FUEL THROUGH PURIFIER.
TRANSFER HEATER- HEATS FUEL AND AIDS IN PURIFYING PROCESS. SAME.

41
Q

JP-5 SERVICE SYSTEM ?

A

IN # 3 GEN, TAKE FUEL FROM THREE STORAGE TANKS AND TWP SERVICE TANKS.

42
Q

JP SERVICE CONTINUED?

A

SERVICE PUMP- IN AN EMERGENCY FOSP CAN TAKE SUCTION DIRECTLY FROM STORAGE TANK BYPASSING FUEL OIL HEATER AND PURIFIER.
JP5 FILTER- FILTERS OUT SEDIMENT/WATER.

43
Q

JP-5 TRANSFER SYSTEM?

A

INCLUDES 3 JP-5 STORAGE TANKS.
TRANSFER PUMP- TRANSFER FUEL FROM STORAGE SYSTEM TO SERVICE SYSTEM RATED AT 50GPM-60PSIG. THERE IS ONE SYSTEM.
GAS TURBINE GRAVITY FEED TANK- 1 JP-5 TRANSFER PUMP..

44
Q

SHIPS ,MAXIMUM CAPACITY FOR F-76 AND JP-5?

A

462,761 AND 30,782

45
Q

PURPOSE OF SEAWATER COMPENSATING SYSTEM?

A

MAINTAIN BALANCE AND BOUNCY OF THE SHIP.

46
Q

PURPOSE OF GTM?

A

GAS TURBINE MODULE. MKAE T HE SHIP MOVE. LM2500 DRIVES PROPULSION SHAFT THROUGH MRG. SPLIT IN TWO SECTIONS. GAS GENERATOR AND POWER TURBINE. GG, PT

47
Q

LM 2500 GTM?

A

4 ENGINES. 2 PER MER. 2190 LUBE OIL WILL COOL IT. 1A+1B MER1, 2A+2B MER2

48
Q

BASE ENCLOSURE ?

A

HOUSES ENGINE. REDUCES HEAT AND NOISE.

49
Q

UNIVERSAL ELECTRONIC CONTROLS.?

A

UEC. 1 PER ENGINE. PROVIDES LOCAL CONTROL OF ENGINE.

50
Q

LUBE OIL STORAGE/CONDITIONING ASSEMBLY( LOSCA)?

A

FILTERS,COOLS.DERATES AND STORES LM2500 SYNTHETIC LUBE OIL FOR GTM. EACH IS LOCATED ONE DECK ABOVE ITS ASSOCIATED GTM. WHICH ALLOWS ATTACHED LUBE OIL PUMP SUCTION TO BE SUPPLIED BY GRAVITY.

51
Q

(GTM) INTAKE?

A

PASSAGE WAY USED TO SUPPLY AIR TO ENGINE.

52
Q

(GTM) COMPRESSOR?

A

16 STAGE COMPRESSOR. COMPRESSES AIR FOR COMBUSTION .

53
Q

(GTM) COMBUSTOR?

A

FOR COMBUSTION AND BLEED AIR. WHERE FUEL AND AIR ARE MIXED AND IGNITED.

54
Q

(GTM) HIGH PRESSURE (HP) TURBINE?

A

2 STAGES. POWER COMPRESSOR

55
Q

(GTM) LOW PRESSURE (LP) TURBINE?

A

6 STAGE. COUPLED TO MRG.

56
Q

(GTM) TRANSFER GEAR BOX. OR ACCESSORY?

A

PROVIDES POWER TO ENGINE LUBE AND FUEL OIL PUMPS.

57
Q

(GTM) ENCLOSURE COOLING SYSTEM. ?

A

COMPRISED OF COOLING FAN AND VENT DAMPER. COOLS EXTERIOR OF ENGINE.

58
Q

(GTM)FIRE DETECTION AND EXTINGUISHING SYSTEM?

A

FLAME DECTECTORS. THREE ULTRAVIOLET SENSORS. TWO TEMP DETECTORS.

59
Q

PURPOSE OF LUBE OIL (L/O) SYSTEM?

A

PROVIDES LUBRICATION FOR GAS TURBINE L/O SYSTEM, MRG (2), MAIN THRUST BEARING (2)

60
Q

GAS TURBINE L/O SYSTEM?

A

L/O COOLING L/O . USES 2190

61
Q

MRG L/O

A

MAIN L/O PROVIDES MAIN FOR MRG AND MAIN THRUST BEARING

62
Q

L/O SERVICE PUMPS ?

A

LOSPs 2 SYSTEM. MER1 AND MER2. LOSP PUMP L/O TO MRG, MAIN TRUST BEARING, AND TO COOL GT L/O SYSTEM

63
Q

L/O COOLER?

A

2.MAINTAINL/O @ CERTAIN TEMPT. SHELL WITH SEAWATER RUNNING THROUGH IT COOLS IT.

64
Q

L/O STRAINER?

A

2.NRM DIFFERENTIAL PRESSURE IS SIX PSID. HIGH ALARM IS ACTIVATED @ 12 PSID FOR 5 SECONDS

65
Q

L/O PURIFIER?

A

2.CAPACITY OF 500 GPH @ 8.3 GHM @ 160 DEGREES F

66
Q

L/O STORAGE AND SETTING TANKS

A
  1. 2 IN MER1 AND MER 2- SETTLING TANKS. HEAT IMPURITIES THAT SETTLE AT BOTTOM OF TANK AND ARE REMOVED AND REPLACED WITH FREASH OIL.