Engineer Flashcards
1
Q
Evaluate deterioration on existing shell material
A
Engineer
2
Q
Authorize all alterations
A
Engineer
3
Q
Review & approve the use of non-code specified lap patches on bottom
A
Engineer
4
Q
Approve lap patch in crit zone if bottom thickness is less than 0.100”
A
Engineer
5
Q
Review the use of Preheat or Controlled Deposition Welding in lieu of PWHT
A
Engineer
6
Q
Perform FFS evaluation to exempt a hydro after major repair or alteration
A
Engineer
7
Q
Do rigorous stress analysis for floor settlement exceeding 653 limits
A
Engineer