Energy plant Maintenance Flashcards
Lock washers:
Select one:
a. Prevent marring of the work surface
b. Distribute the lock nut force
c. Reduce the chances of unwanted turning of the bolt or nut
d. Prevent the equipment from being dismantled
c. Reduce the chances of unwanted turning of the bolt or nut
The external inspection of a boiler:
Select one:
a. may include ensuring the pressure relief valves are the correct setting and capacity
b. may include making sure the furnace refractory is in order
c. may include making sure the exterior of the tubes are in good condition
d. must be done after the boiler has been drained
a. may include ensuring the pressure relief valves are the correct setting and capacity
One of the main purposes of an external boiler inspection is to:
Select one:
a. observe and assess boiler operation and maintenance practices.
b. inspect all auxiliary equipment and pressure vessels.
c. thoroughly assess the water treatment program.
d. thoroughly examine the boiler waterside.
a. observe and assess boiler operation and maintenance practices.
For an alkaline boil out, a boiler is fired and maintained under steam pressure for about: Select one: a. 7 days b. 30 Days c. 48 hours d. 10 hours
c. 48 hours
In order to prevent a rope from untwisting under load:
Select one:
a. It should be moistened
b. Iit should have thimbles installed on the ends
c. It has counteracting left-handed and right-handed twists
d. Each end requires “whipping”
c. It has counteracting left-handed and right-handed twists
A steam boiler that is to be shut down for a long period of time should be:
Select one:
a. Drained, thoroughly dried, have desiccant placed inside, and closed up
b. Left with the water at normal working level but opened up to atmosphere
c. Left with the water at normal working level and pressurized with air to 50 kPa
d. Filled completely with water and the vent left open to atmosphere for expansion
a. Drained, thoroughly dried, have desiccant placed inside, and closed up
The point of a properly ground drill bit should be: Select one: a. 35° b. 78° c. 118° d. 135°
c. 118°
Which of the following valves is locked or tagged open when preparing a boiler for internal inspection?
Select one:
a. bottom blowoff
b. non-return drain
c. continuous blowdown
d. header isolation
b. non-return drain
The packing gland of a hot water boiler circulating pump should have some leakage:
Select one:
a. To prevent the packing from drying out.
b. So that the shaft sleeve will wear instead of the shaft.
c. To allow air to exit the pump, so the pump does not lose its prime.
d. So the operator can tell if the sealing water is turned on.
a. To prevent the packing from drying out.
The recommended inspection procedures for a power boiler are outlined in the:
Select one:
a. CSA B51 Boiler, Pressure Vessel and Pressure Piping Code
b. ANSI B31.1 Power Piping Code
c. ASME Boiler and Pressure Vessel Code, Section I
d. ASME Boiler and Pressure Vessel Code, Section VII
d. ASME Boiler and Pressure Vessel Code, Section VII
Wire rope classified as 8 x 12 means it has:
Select one:
a. A factor of safety of 8 and is 12 strands
b. A factor of safety of 12 and is 8 wires per strand
c. 8 strands with 12 wires per strand
d. 8 strands containing 12 yarns each
c. 8 strands with 12 wires per strand
When joining two ropes of different diameters we use a: Select one: a. braiding b. Sheet bend c. Figure eight knot d. Sheep shank
b. Sheet bend
What pressure is applied to a boiler during a hydrostatic test?
Select one:
a. 1.5 times the setting of the safety valve.
b. 1.5 times the maximum allowable working pressure.
c. Design pressure.
d. 2 times the setting of the lowest set safety valve.
b. 1.5 times the maximum allowable working pressure.
Prior to a worker entering the steam drum of an off-line boiler that is connected to a common, pressurized steam header, the
Select one:
a. header must be shut down and depressurized
b. Boiler Inspector must be informed before any work occurs
c. main steam, blowdown and feedwater valves must be closed, locked and tagged
d. drum must be vented, the safety valve must be gagged, and all ash and soot removed from the firebox
c. main steam, blowdown and feedwater valves must be closed, locked and tagged
Copper sulphate may be used: Select one: a. As a thread cutting fluid b. For lubricating very fine threads such as those in a micrometer c. Coating tools to prevent rusting d. As a marking or layout material
d. As a marking or layout material
Channels or flutes are: Select one: a. types of wrenches b. parts of a die c. types of punches d. gaps in a tap for chips
d. gaps in a tap for chips