Embarkation Flashcards
AACG
Arrival Airfield Control Group
Receives and controls units until released to parent unit.
DACG
Departure Airfield Control Group
Control unit from marshaling area until released to Tanker Airlift Control Element (TALCE)
Marshalling
Process of moving equipment, cargo and personnel to temporary staging area
463L
Aluminum with balsa wood core Dimensions 88x108 Usable area 84x104 7,500 weight-290lbs/355lbs w/2 side nets(green) 1 top net(yellow) 22 D-Rings
4 categories of shoring
Rolling- protects while transporting minimum 3/4
Parking- protects during flight minimum 3/4
Sleeper- under frames/axels with weight over 20,000lbs
Special- decreases approach angle of ac loading ramps
C-130 Hercules
Allowable cabin load- 25,000lbs
Pallet positions-6
Passengers-92
C-17 Globemasters III
Allowable cabin load-90,000lbs
Pallet positions-18
Passengers 102
C-5 Galaxy
ACL-150,000lbs
Pallet positions-36
Passengers 81 (w/all pallets)
MOCC
Mount Out Control Center
Controls, coordinates, and monitors all personnel, supplies, and equipment to an embark station.
MCC
Movement Control Center
Coordinates movement of all personnel, supplies, and equipment.
Convoy/Ground transport requests 72 hrs prior
TALCE
Tanker Airlift Control Element