Element 1-17 Equipment Tests Flashcards
What is the proper procedure for testing a radiotelephone installation?
transmit the stations call sign followed by the word TEST on the frequency being used for the test
When testing is conducted on 2182 kHz or Ch-16 testing should not continue for more than ____ in any 5 minute period
10 seconds in any 5 minute period
Under GMDSS, a compulsorily VHF-DSC radiotelephone installation must be tested at what minimum intervals at sea
Daily (distress signal is so important)
The best way to test the MF-HF NBDP system is
(narrow band direct printing)
to send an ARQ call to a coast station and wait for the automatic exchange of answerbacks
The best way to test the Inmarsat-C terminal is
compose and send a brief message to your own Inmarsat-C terminal
When may you test a radiotelephone transmitter on the air?
at anytime except during silent periods as necessary to ensure proper operation