Elelctical 2 Flashcards
Location of the APU Battery
Aft equipment bay
Location of the Main Battery
Nose compartment
How many TRU’s are installed in the CRJ900?
4
Where are the are the TRU’s located?
Nose compartment
How many generators are installed?
Four
2 engine generators
1 APU generator
1 ADG
What is the function of the 4 TRU’s
To convert 115v AC to 28V DC
How are the TRU’s cooled?
Individual Fans
If the main buses are powered, are the essential busses automatically powered?
Yes
Is there an on/off switch for the TRU’s?
No
They are automatically powered when the AC buses are powered
What controls the DC tie contactors?
The DC power centers (DCPC) automatically control DC toe operation
What lights will illuminate when the master switch is turned on?
AC ESS TXFR L Boost Pump INOP R Boost Pump INOP Press Cont Fault L Pack OFF R Pack OFF Mach Trim