D&C system is composed of.

A

Two NiCad batteries
Three TRUs
DC external power unit.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

AC system is composed of

A
Two IDGs
APU generator
Inverter
RAT
AC external power unit.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

IDGs, APU provide electrical power rated at.

A

40 kVA, 115 VAC, 400 Hz, three phase.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

RAT supplies power to

A

ESS BUSES when both AC BUSES 1 and 2 are not powered.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

IDG Manual disconnect

A

Must be re-connected on the ground by mx.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

During the start cycle

A

Batt 2 is isolated from the network, powering the APU START BUS exclusively.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Power priority

A

Onside, APU, GPU, Offside.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How many seconds until the RAT powers AC ESS BUS.

A

8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

During the 8 seconds after the RAT has been deployed, The batteries power.

A

The DC ESS BUS through the ESS TRU.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

RAT powers what ACMP

A

3A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The NBPT allows un-interrupted gen. swaps between:

A

IDGs, GPU and APU generator.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

If the NBPT does not work:

A

A break-transfer takes place instead.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How many TRUs?

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Volt/Amp rating of the TRUs.

A

300 A