What kind of batteries are installed in BJM’s Hawker’s?
Lead Acid.
What are the lead-acid batteries rated at?
24 volts and 28 Amp Hours.
What is the maximum continuous generator load limit?
300 Amps
How can a generator be manually disconnected from its PS bus?
Select the generator switch to TRIP.
How can the battery charge rate be monitored?
Depress the ammeter BATT push button.
How can the ammeter scale be enlarged for more accurate viewing?
While holding the depressed BATT push button, depress the 0-40 button.
Where is the ground power receptacle?
On the right rear fuselage.
The initial selection of the battery switch to ON causes:
It closes both emergency contactors supplying power from both batteries to the PE bus.
With the battery switch selected ON, the power to close both emergency contactors is provided by:
With the battery switch ON, the power from battery 1 closes both emergency contractors.
When charging batteries from a GPU, how may charge rate be confirmed?
By a BATT amp reading on the overhead panel when pushing the AMP BATT push button.
After starting both engines using external power, what actions should be taken?
- Select STARTER POWER switch - OFF
- EXT POWER switch - OFF
- External Supply - Disconnect
- Check batteries charging
May the airplane engine or APU generators be used to assist ground power in starting an engine?
- NO. When ground power is used the engine and APU generator line contactors are held open.
When using external ground power, the bus bar system is energized only when the ground power voltage is between _______ and _______ volts.
- 24.5 and 29.5 Volts
The maximum battery charge rate immediately before takeoff shall not be greater than:
- 20 Amps
Why is the battery charge rate limited immediately before takeoff?
- To ensure that there will be a minimum of 10 minutes battery power available immediately after takeoff in the event of a double generator failure.