Electrical Flashcards
Electrical Contractor Management Unit (ECMU) function is:
a. control of AC and DC bus ties
b. TR contractors monitoring
c. automatic management and monitoring
c. automatic management and monitoring
Loss of one generator or TR:
a. results in the loss of the corresponding AC or DC bus
b. has no effect on flight management
c. requires to have the APU generator operational
b. has no effect on flight management
The minimum number of generators required to supply all the network (in a non-overload condition) is
a. one engine generator
b. one engine generator and the EMER generator
c. two generators
a. one engine generator
The emergency generator is powered by:
a. a Ram Air Turbine
b. the Static Inverter
c. the green hydraulic system when pressurized by engine 1 or 2 driven hydraulic pump or by Ram Air Turbine
c. the green hydraulic system when pressurized by engine 1 or 2 driven hydraulic pump or by Ram Air Turbine
An engine generator is driven:
a. at a ratio of 5:1 to engine speed
b. direct from the accessory gear box
c. by an Integrated Drive Generator (IDG)
c. by an Integrated Drive Generator (IDG)
Each engine generator supplies power to:
a. its assigned AC BUS in normal operation
b. the opposite side AC BUS in normal operation
c. only its assigned BUS in all cases
a. its assigned AC BUS in normal operation
The APU battery:
a. is dedicated to APU start only
b. may be used for Engine Start when the APU is not available
c. can be used as a backup for Battery One or Battery Two
a. is dedicated to APU start only
Normally which AC BUS supplies the ESS TR?
a. AC BUS 1
b. AC BUS 2
c. AC ESS BUS
a. AC BUS 1
When the Battery selector is in the #2 position, which of the following is true?
a. BAT 2 has been selected to start the APU
b. BAT 2 voltage can now be read in the voltage indicator window
c. APU BAT voltage can now be read in the voltage indicator window
b. BAT 2 voltage can now be read in the voltage indicator window
In flight, APU not running, an engine generator has failed, which source is supplying the the corresponding AC BUS?
a. the Static Inverter
b. the AC BUS is lost
c. the other side engine generator
c. the other side engine generator
Two Electrical Contactor Management Unit (ECMU) provide:
a. control of TR contactors
b. AC and DC contactors control and monitoring except for TR contractors
c. AC and DC contactors control and monitoring except for TRs which have their own control, gallery shedding and no break power transfer
c. AC and DC contactors control and monitoring except for TRs which have their own control, gallery shedding and no break power transfer
The ESS TR s normally supplied by which BUS?
a. AC ESS BUS
b. AC BUS 1
c. AC BUS 2
b. AC BUS 1
When TR 1 is lost, due to unpowered AC BUS 1:
a. there is no degradation in the capability of the DC system
b. the APU BAT BUS is discharging at a rate of 2 amperes
c. the Static Inverter is being powered because TR 1 is not powered
a. there is no degradation in the capability of the DC system
- When the C/B ECAM page shows NORMAL in green, it indicates:
a. there are no C/Bs tripped or pulled
b. electric supply to C/Bs is normal
c. no fault detected in the Electronic Equipment Bay
a. there are no C/Bs tripped or pulled
- The last C/B tripped is displayed (ECAM C/B page):
a. on top of the tripped C/B list
b. on the last tripped C/B list
c. not shown
a. on top of the tripped C/B list