T/F
EIFS can be found in combustible and non-combustible occupancies, including offices, taxpayers factories, hotels, MDs, and private houses. 1.1.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

T/F
EIFS is a lightweight to medium weight, synthetic cladding system found on Building exteriors. 1.2

A

False
Lightweight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

EFIS consist of three layers: the innermost insulation layer composed a foam plastic insulation the middle, reinforcing fiberglass mesh. And the outermost finish coat layer will be a cement based polymer.1.2

A

False
USUALLY a cement based polymer.
1- foam plastic insulation
2- reinforcing fiberglass mesh
3-usually cement- based Polymer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

EIFS
The component of primary concern during firefighting operations is the innermost sheathing layer of ? 1.3.

A

Foam plastic insulation.(FPI)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

EFIS
The innermost layer of foam plastic insulation is typically how thick? 1.3.

A

Typically 1/4 to 8 inches thick.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

EFIS
The rate of heat release for thermoplastics can be —— to ——higher than the ordinary combustibles such as wood or paper 1.3

A

3 to 5 times higher

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

EFIS buildings are especially vulnerable to ——- —- —-and in sources found during the construction phrase such as portable heaters, salamanders torches, welding equipment. 1.4.

A

Adjacent outside fires (car, rubbish, etc.)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

EFIS fires often extend via a ——- or —— layer. 1.5.

A

Poorly maintained or damaged finish coat layer.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

EFIS
At structural fires, the same properties can adversely affect firefighting operations by? 1.7.

A

Increasing the potential for flashover.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

EFIS
The ——-arriving engine should consider using ——— for a rapid attack and knockdown 2.1

A

1st arriving
Deck gun

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

T/F EFIS
Initial handlines should be positioned for BOTH an interior and exterior attack on the fire. 2.2.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

EFIS
T/F A handline should be stretched to cover ALL sides of the building. 2.3

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

EFIS
T/F A building 3 stories or higher, or a large area building may require the use of 2 1/2 inch handline.
An 1 3/4 handline may be sufficient for a smaller PD. 2.3.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

EFIS
Where should the TIC be used at these fires? 2.4

A

Interior and exterior to determine the extent of the fire.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

EFIS
At what phase of the fire, with a TIC , have a more thorough examination? 2.4.

A

Overhaul phase to ensure that Fire did not continue to smolder undetected. A watch line SHOULD be kept in place as necessary.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

All EFIS buildings ——- be entered into CIDS. 2.7

17
Q

EFIS
10-75 is given. Which extra units do you get special called. 2.8.

A

Extra engine
Extra truck
( if no Tower Ladder on scene from the 1st alarm assignment a Tower will be assigned)

18
Q

EFIS
Which has the furthest reach a Tower Ladder Monitor or Satellite Monitor. 3.1

A

Tower 135
Satellite 130

19
Q

EFIS
Tower Ladder stream can not reach the fire. What is the next plan of action? 3.2

A

2 1/2 line cockloft nozzle

20
Q

EFIS
At a EFIS fire, one tip of the cockloft nozzle should be capped with a —- shut off. The cockloft nozzle operated upward on exterior of the building can provide a vertical reach of up to —— floors. The nozzle should be extended approximately
— feet from the window sill and then operated a slight angle toward the building. 3.2

A

1 1/2 shutoff
2 floors