Using the Figure for Question 1, of the four channels (0-3) which RTIJ Drop has the greatest error accumulation?
A. CH 3 RTU Drop 00
B. CH 2 RTU Drop 00
C. CH 1RTU Drop 04
D. CH 0 RTU Drop 04
D
When working at an existing plant on a process modification, the primary resource for locating documentation on existing instrumentation is the:
A. Plant equipment library.
B. Vendor’s representative.
C. Project manager.
D. Project engineer.
D
If the item 1.3.6.1.2.1.1.3 was selected what value would be presented?
A. a number representing time since last network (for SN:MP) initialization
B. a text string providing a concise description of the device in seconds
C. a floating point single precision number representing up-time
D. a .01 second count of ticks since power on for computer
A
One of the most basic rules in interpreting control charts is that a state of statistical control is violated when:
A. Automatic control parameters are adjusted to prevent manual control.
B. Operations perform manual overrides of the control parameters.
C. Any point of the process exceeds the control limits
D. All points of the process are within tolerance.
C
If you wished to add a local indicator to IT124 and it was an integral indicator, how would you change the hard copy diagram for submission to document control?
A. Using a yellow pen you would change the dotted line to solid
B. Using a blue pen you would change the tag to read TTI 124
C. Using a red pen you would change the tag to read TIT 124
D.No change would be necessary, use as drawn
C
All of the following information is found on an Instrument Data Sheet EXCEPT:
A. Tag numbers.
B. Calibration information .
C. Manufacturers information .
D. Pipe connection Information.
D
An alphanumeric listing of all the devices or functions in a control system together with various drawings and other references is called an:
A. Instrument index.
B. Instrument system.
C. Instrument channel.
D. Instrumental analysis.
A
In a project package which document takes precedent when there is a drawing conflict?
A. P&ID.
B. Loop sheets.
C. Instrument index.
D. Installation drawings.
A
Which document is used to determine the currency of a specific instrument drawing?
A. Master list.
B. P&ID revisions.
C. Job specifications.
D. Related instrument data sheet.
B
When working with an engineering consultant, the engineering project scope of work serves to communicate and define all of the following EXCEPT:
A. What type of documents will be produced.
B. Who will be in charge of the control system design.
C. What services will be provided as part of the project.
D. What subcontracts or vendor services will be required.
B