Dirt Flashcards

1
Q

By line go through the 6 step problem solving format for Hasty Crater Charge ?

A

1) How wide
2) 5ft deep (Times) 10 lbs. explosive per hole = 50
3) N/A
4) 50 divided by Package weight
5) (width) minus 16, divide by 5, plus 1 (round) = number of holes
6) 50 lbs. per hole (times) number of holes = Total number of packages

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

By line go through the 6 step problem solving format for Deliberate Crater Charge ?

A

1) How wide
2) 7 foot hole: 80 lbs. 5 foot holes: 40 lbs.
3) N/A
4) 80 & 40 divided by Package weight
5) (width) minus 16, divide by 5, plus 1 (round) = total number of holes.
6) 7 ft./5 ft. totals per hole (times) number of holes = Total number of packages.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

By line go through the 6 step problem solving format for Relieved Face Crater Charge ?

A

1) How wide
2) Friendly: 40 lbs. Enemy: 30 lbs.
3) N/A
4) 40 & 30 divided by Package weight
5) (width) minus 10, divide by 7, plus 1 (round) = number Friendly of holes.
6) Friendly/Enemy totals per hole (times) number of holes = Total number of packages.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How do you figure the number of 7 foot and 5 foot boreholes needed for a deliberate crater ?

A
  • Where there is an even number of boreholes needed there will be two more 7 foot boreholes then 5 foot.
  • Odd numbers result in a difference of one.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the 3 type of Boulder removal methods ?

A
  • Mudcapping
  • Snake hole method
  • Block hole method
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How many pounds of explosive per foot of diameter for dead stump ?

A

1 pound of explosive

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

How many pounds of explosive per foot of diameter for live stump ?

A

2 pound of explosive

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How much do you add for standing timber ?

A

Increase by 50 % for standing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Approximately how high do you measure stumps above ground ?

A

18 inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What explosive is most ideal for stump charges ?

A

M-1 Military Dynamite

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the formula for Hasty Crater Charge ?

A

Width needed - Minus 16, Divide by 5 , + 1

Line 5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the formula for Deliberate Crater Charge ?

A

Width needed - Minus 16, Divide by 5 , + 1

Line 5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the formula for Relieved Face Crater Charge ?

A

Width needed - Minus 10, Divide by 7 , + 1

*Line 5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the three types of Crater charges ?

A

Hasty
Deliberate
Relieved Face

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The first borehole for a Hasty Crater And Deliberate Crater is how many feet in from edge of desired edge of crater ?

A

8 Feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The center to center spacing for a Hasty Crater And Deliberate Crater is how many feet between boreholes ?

A

5 feet.

17
Q

The center to center spacing for a Relieved Face Crater is how many feet between boreholes ?

A

7 Feet.

18
Q

The first borehole for a Relieved Face Crater is how many feet in from edge of desired edge of crater ?

A

5 feet.

19
Q

For a relieved Face Crater how far apart are row placed on:
Dirt/Gravel Road:
Hard surface Roads :

A

Dirt/Gravel Road: 8 feet apart

Hard surface Roads : 12 feet apart