Design and specification Flashcards
1
Q
What are the stages of the RIBA plan of work 2020?
A
0 - Strategic definition 1 - Preparation and briefing 2 - Concept design 3 - Spatial Coordination 4 - Technical design 5 - Manufacturing and Construction 6 - Handover 7 - Use
2
Q
What were the main changes to the RIBA Plan of Work in 2020?
A
The main changes are to do with Building Information Modelling (BIM) – the technology of design – and sustainability. BIM is now fully part of the Plan of Work, while the importance of sustainability has been made much clearer.