Demin water system Flashcards
demin water system is designed for the required demin as make up for
BFW
Chilled water initial fill
Fresh caustic dilution water
CW
Power plant
PE3 make up
AEU
BLANK will send demin water as make up to NCP CW system, for Fresh
Caustic Dilution, Power plant, and AEU
G-3151A/B
BLANK each with a capacity of 89.4 m3/h will send demin water as
a make up to deaerator, initial fill to Chilled Water expansion drum and PE3.
G-3158 A/B
BFW make-up to deaerator
42 m3/hr
PE3 make-up
9 m3/hr
NCP CW
34 m3/hr
Caustic diln
38 m3/hr
chilled water initial fill
45 m3/hr
AEU
4 m3/hr
power plant
13.5
total design cap. of demin water package W/ 1 train in operation and 1 train in regen during normal op/ 2 trains during emergency/restart
110 m3/hr
the balance of BLANK emergency reqt will be sourced form MBP for surface condensate thru cross-over line.
168.9 m3/hr