What is a Data Center?

A

A facility or room used to house mission critical computer systems and associated components fro companies and organizations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Why use a Data Center? 6

A
  1. Geographic separation
  2. Power supply
  3. Cooling
  4. Usable space
  5. Fire rating
  6. Noise
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Data Center Attributes (6)

A
  1. Cost
  2. Power
  3. HVAC - cooling
  4. Connectivity - Carriers, ISP, Own Fibre, Radio
  5. Security
  6. Access
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Space

A

Carrier, Service Provider, Carrier Neutral, Own

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Air Flow

A

Raised floor, close-coupled cooling on slab

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Fire Suppression

A

none, Inergen, FM200, Novec 1230, Argonite

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Cabling system

A

punchdown

plug - RJ45

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

UPS

A
Line-interactive
Double-Conversion
Online
DC power
Rotary
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Protection

A

Power conditioners

Line filters

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Mains Supply

A

Diverse grid fleeds
Gensets
Stationary fuel cell

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Data Center Tiers Design?

A

Tier 1, Tier 2, Tier 3, Tier 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Tier 1

A

Non redundant capacity components (single uplink and servers) (99.671%)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Tier 2

A

Tier 1 + Redundant Capacity components. (99.741%)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Tier 3

A

Tier 1 + Tier 2 + Dual Powered equipment and multiple uplinks. (99.982%)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Tier 4

A

Tier 1 + Tier 2 + Tier 3 + all components are fully redundant including storage, chillers, hvac, servers etc. (99.995%)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Min Clear Height

A

2.6m

17
Q

Min floor loading

A

12kPA - 1200kg/sqm

18
Q

General Data Centre Requirement “Entrance room”

A

Entrance room with man trap to prevent tailgating

19
Q

General Data Centre Requirement “Access”

A

Biometric access

20
Q

General Data Centre Requirement “door”

A

Wide access doors. Min door size 1m wide 2.13m high - other that man trap access

21
Q

General Data Centre Requirement “Plant room”

A

Plant room for UPS, batteries, etc

22
Q

General Data Centre Requirement “Service room”

A

Staging/service room/loading bay to allow access fro larger equipment and pallet jacket

23
Q

General Data Centre Requirement “Air Condition”

A

22 degrees C +/- degree C

24
Q

General Data Centre Requirement “Humidity”

A

30% to 60%

25
Q

General Data Centre Requirement “Lighting”

A

Lighting 450 lux at 1.2m above finished floor level

Emergency lighting

26
Q

General Data Centre Requirement “Power”

A

Standby power should assure 48 hours sustainability without re-fueling

27
Q

General Data Centre Requirement “Security”

A

Integrated and alarmed BMS

Building security - integrated with site security, CCTV, coverage of entry and internal areas.

28
Q

General Data Centre Requirement “Water”

A

Underfloor water detection

29
Q

General Data Centre Requirement “Fire Rating”

A

Computer room envelope to have minimum 2 hour fire rating - to exclude fire from room.

30
Q

Cooling the Data Centre

A
CRAC
Hot/Cold Aisle Containment
In Row Cooling
In Rack Cooling
Free Cooling
31
Q

CRAC

A

Refrigerant based to produce pressure under floor

32
Q

CRAH

A

Computer Room Air Handler to cool the room and move air within in.

33
Q

Humidifier and Chiller

A

Humidifiers replace water loss before the air exits the AC units.
Chiller produces cold water for refrigeration process to either CRAC or CRAH.