Which phase of constructing a curtain wall is the most critical?
Layout
True or false: You can use an optical plummet to transfer control lines to other floors.
True
After the ironworker marks the centers of the mullions along the edge of the slab with a framing square, the next step in establishing control lines is to verify the __________ for all erected floors.
Elevation
Foremen should plan unloading to make the ________ of materials easier.
Distribution
Why are mullions usually first hung temporarily?
So they can be located precisely
When should the ironworker drill and attach the mullion to the mullion anchor?
Once the elevation and distance to the working control lines are checked.
What should be used to prevent damage where trim is snapped in place?
Rubber hammer
True or false: Glazing is a primary method of fastening column covers and cladding.
True
A test of the curtain wall system often indicates if there is a problem with:
curtain wall materials
These are slotted to allow expansion of the curtain wall unit
Expansion anchors