Curtainwall Day 2 Quiz Flashcards

1
Q

Which phase of constructing a curtain wall is the most critical?

A

Layout

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

True or false: You can use an optical plummet to transfer control lines to other floors.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

After the ironworker marks the centers of the mullions along the edge of the slab with a framing square, the next step in establishing control lines is to verify the __________ for all erected floors.

A

Elevation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Foremen should plan unloading to make the ________ of materials easier.

A

Distribution

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Why are mullions usually first hung temporarily?

A

So they can be located precisely

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

When should the ironworker drill and attach the mullion to the mullion anchor?

A

Once the elevation and distance to the working control lines are checked.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What should be used to prevent damage where trim is snapped in place?

A

Rubber hammer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

True or false: Glazing is a primary method of fastening column covers and cladding.

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A test of the curtain wall system often indicates if there is a problem with:

A

curtain wall materials

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

These are slotted to allow expansion of the curtain wall unit

A

Expansion anchors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly