Division 00
PROCUREMENT AND CONTRACTING REQUIREMENTS: This division covers requirements for bidding and contracting including bid solicitation instruction to bidders, bid forms, the agreement (contract), bonds and certificates, and general conditions of the contract, supplementary conditions, addenda, and modifications. These parts of the contract docunent are discussed in Ch. 50.
Division 01
GENERAL REQUIREMENTS: This division includes requirements that are applicable to the entire project or all the individual technical sections. These include a summary of the work, how pricing and payment will be handled, alternates, value analysis, contract modification procedures, unit prices, construction progress documentation, submittal procedures (for samples, shop drawings, etc.), quality control, temporary facilities at the job site, product substitution procedures, owner-furnished items, special execution requirements, and final cleaning and protection of the work.
Division 02
EXISTING CONDITIONS: This division is now used to specify site remediation, site decontamination, subsurface investigation, surveying, and selective demolition, among other items related to existing conditions on a job site.
Division 03
CONCRETE: This division covers all aspects of concrete, including forms, reinforcement, cast-in-place concrete, precast concrete, cementitious decks and underlayment, grouts, and concrete restoration and cleaning.
Division 04
MASONRY: This division covers all aspects of masonry, including brick, concrete block, stone, terra cotta, simulated masonry, glass block, and masonry restoration and cleaning.
Division 05
METALS: The metals division includes all types of structural steel and other structural metals, ornamental metals, metal fabrications (metal stairs, ornamental ironwork, handrails, gratings, metal castings, and stair treads and nosing), as well as expansion joint covers and metal restoration and cleaning. Light-gage metal framing for partitions is located in Division 09 (Finishes)
Division 06
WOOD, PLASTICS, AND COMPOSITES: This division covers typical structural wood framing, tough carpentry, finish carpentry, and architectural woodwork. It also includes structural plastics, plastic fabrications, wood and plastic restoration and cleaning, and the newer plastic wood and other specialty coposite materials. Note that manufactured casework is in Division 12, Furnishings.
Division 07
THERMAL AND MOSTURE PROTECTION: This is the same as the previouse edition of the MasterFormat and includes dampproffing and waterproofing, insulation, vapor retarders, air barriers, shingles, roof tiles, sliding, membrane roofing, flashing, joint sealers, fire and smoke protection, and roofin specialties such as roof hatches, smoke vents, roof pavers, scuppers, and gravel stops.
Division 08
OPENINGS: This was formerly called Doors and Windows but contains the same elements as before including metal doors and frames, wood doors and frames, specialty doors, storefronts, all types of windows skylights, hardware, curtain walls, and glazing.
Division 09
FINISHES: The Finishes division covers all types of finish materials, including plaster, gypsum wallboard (including metal framing), all types of floor and wall tile, terrazzo, all types of flooring materials, acoustical ceilings and other types of decorative ceilings, wall coverings, acoustical treatments, paints, and other coatings.
Division 10
SPECIALTIES: The specialties division covers a long list of items including visual display boards, toilet compartments, louvers, grilles, wall and corner guards, access flooring, pre-built fireplaces, flagpoles, signage, lockers, awnings, demountable partitions, storage shelving, exterior protection (sun screens, storm panels, etc.), and toilet and bath accessories.
Division 11
EQUIPMENT: This division contains information for architectural equipment including vaults and security items, teller and security equipment, church-related equipment, library equipment, theater and stage equipment, musical equipment, mercantile equipment, checkroom equipment, vending machines, audio-visual equipment, loading-dock equipment, detention equipment, athletic equipment, medical equipment, mortuary equipment, and equipment for laboratories, planetariums, observatories, and offices.
Division 12
FURNISHINGS: Division 12 includes furniture, systems furniture, art, sindow treatments, accessories, multiple seating, and interior plants. Note especially that this division includes manufactured casework, whereas custom casework would be in Division 06.
Division 13
SPECIAL CONSTRUCTION: Special construction covers air-supported structures, special-purpose rooms (clean rooms, saunas, planetariums, etc.), seismic control, radiation protection, lightning portection, pre-engineered structures, hot tubs, and kennels.
Division 14
CONVEYING EQUIPMENT: Division 14 includes elevators, escalators, dumbwaiters, moving walks, and lifts.