Name the the main members of the project team.
Owner, Contractor, Consultant
Who is responsible for: Purchases and maintains liability insurance, and furnishes performance and payment bonds?
Contractor
Who is responsible for: Installs, maintains and supervises safety?
Contractor
Who is responsible for: Represents the owner?
Consultant
Who is responsible for: Observes the project, and determines the progress and quality of the work through site reviews.
Consultant
Who is responsible for: submits itemized application for payment
Contractor
Who is responsible for: recommends amounts due and certifies payment.
Consultant
Who is responsible for: interprets construction documents
Consultant
Who is responsible for: reviews work verifies compliance
Consultant
Purchases and maintains liability insurance?
Contractor 1.1.1.1
Who does the owner expect to be fair when pricing changes in the work?
Contractor
A budget is how much money is available to spend? T or F
True
Describe the difference between a project budget and a construction budget:
CB. = sum available for construction
PB = entire project incl CB land costs professional fees include legal right of way etc..
List the four principal methods for estimating project costs:
Order of magnitude, square foot/ meter cubic foot meter, system estimates, unit price estimates.
The construction phase is when the method of project delivery is determined? T or F
False
The commissioning phase begins when?
Early in the construction process.
The construction phase is when project systems and assemblies are tested to ensure they meet design intent?
Operations phase
Why addendum should not be issued to close to the bid closing date?
Enough time to respond.
Where should the conditions for disqualification of the bidder be included?
Instructions to bidders.
What type of information should be included in the instructions to bidders?
Where call bids, method for bids, address or email; time / date; other instructions; conditions affecting award of contract; bid security requirements; cobtractvexec req
Define the project manual?
Written / bound document information for bidding and negotiation + constructing and completing the project. Not the drawings.
The general conditions of a contract define the administrative, temporary and procedural req of a project.
False. The answer is general requirements. GC is from CCDC (defines relationships, rights and responsibilities)
The relationship between spec and drawings is ?
Complementary
What is a spec
Written description of materials and methods.
Master Format is divided into what 5 subcategories?
1 general req; 2 facility construction; facility services; site and infrastructure; process equipment.
Master format is used to define the scope of work of trades
False
Explain the difference between a prescriptive and performance spec
Pre recipe Finnish work
Perform detailed result
Referencing a performance standard is a good way to ensure high quality products
False, not all standards are good
What is the main reason for using a proprietary spec
Control product selection, ensure exact results
How is a consensus standard incorporated into a spec
Reference to a number, title and other designation
Explain why it is important to date when referencing a consensus standard
Allows the contractor to determine what design conditions were in force when the project manual was issued. Unfair not to.
What preferred grammatical mood for structuring specification sentences
Imperative
When writing a number less than one in a specification, a zero hound be placed to the left of the decimal point
True
Explain why “Consultant” might be capitalized in the project manual?
Defined terms in GC
Explain why the recommendations for language and style are important
Accuracy, brevity and clarity - easy to understand
Describe the process a specification writer should use if he or she wants to reuse an old specification section for a new project.
Research and check details, make sure the section is written correctly and coordinated with other parts.
Explain why a master specification needs to be edited before it can be used in a project.
Lots of choices; materials, methods and practices. To meet the projects requirements you need to delete unnecessary info, only relevant information is included.
Drawings and specifications should use the same ________ terms for the same products.
Generic
A technical rep can use SD design docs to:
A - prep a bid to supply material to GC
B - offer advise on prelim costing and available products or systems.
C - produce shop submittals
D - review constructed work
B - offer advice cost and avail
Who determines the completeness of closeout submittals
A - the contractor
B - the building operator
C - the AHJ
D - the contract administrator
D - the contract admistrator
The primary users of the drawings are the owner, the consultant and the contractor. List three others.
AHJ, tenants, facility managers
Describe three ways in which a spec writer uses project technology docs
Increase and enhance the spec requirements for docs
Expand the listing of product manufacturers
Review install methods / adjust office master spec
Subgroup within MasterFormat that includes mechanical and electrical subject matter.
Facility services
Group G in uniformat
Sitework
Type of spec where end result is specified
Performance
This type of specification similar to a recipe
Prescriptive
Type of spec to control product selection
Proprietary
Abbreviation for doc produced during schematic design that accompanies the drawings
PPD - ? Preliminary Project Documents
Organizational document used to format cost estimates
Uniformat
How GC of Contract are modified
Supplementary conditions
Group A in uniformat
Substructure
Type of standard incorporated in a project manual by reference to number, title and date
Consensus standard
Document used to organize the project manual
MasterFormat
Document used to organize information within a work result
Sectionformat
Name of Division 27
Communications
The relationship between project manual and the drawings
Complementary
Name part 3 of sectionformat
Execution
Number digits most section numbers
6
Name part 1 of section-format
General
Number of distinct parts in a specification section
3
Explain fast-tracking
The process of overlapping activities to permit parts of construction to start before design is done.
Which construction delivery method generally precludes fast tracking
Design bid build
Identify and explain each of the three contractual methods of payment.
Stipulated price: amount set forth as total payment for the performance of the work.
Unit price: the amount payable for a single unit of work
Cost plus fee: reimburse actual cost plus fee
Project delivery method: design build finance operate maintain?
Design build finance maintain + p3’s
Which is an advantage to use standard contract.
A. Time saved not read non standard contract
B. Owner knows proj cost certainty
C. Stand contract = fast tracking
D. Scope / quality known construction begins
A i guess
Describe the purpose of supplementary conditions
Amend or supplement preprinted general conditions
The term for water-efficient choices in planting and irrigation design.
A. Zeroscaping
B. Xeroscaping
C. Xeriscaping
D. Drought tolerant landscaping
C. Xeriscaping
A specification writer concerned about VOC’s from a new carpet would specify compliance with..
A. Carpet and Rug institute green label program
B. Carpet and Rug Low VOC program
C. Carpet and Rug Institute Green Seal Program
D. Carpet and Rug Institute Green Globes Program
A. Page 184.
List two ways the CABC promotes sustainable building.
Advocates for green buildings / change industry standards
Which non Canadian standard is NOT listed in the NBC
A. ASTM
B. Factory Mutual
C. ISO
D. NFPS
E. Occupational Safety and Health Administration (OSHA)
E. OSHA
Which of the following is NOT a benefit of referencing consensus standards in a project manual.
A. Faster, easier and avoids duplication
B. Easy to keep up to date
C. Saves task of writing elaborate text
D. Reduces the volume of the project manual
B. Easy to keep up to date.
How would a lawyer define liability.
The legal concept of responsibility of one person to another.
Name four Hazards, threats, unwanted events, unforeseen conditions, or other failures that might occur during a project.
1) Accidents to personnel, 2) unforeseen conditions, 3) significant design inadequacies, 4) inadequate operating procedures
What are three requirements for a contract to be considered valid.
Offer, acceptance of the offer and consideration
Effective management of risk relies on the ability to reduce what two factors
Proposal Risks and Performance Risks
Which of the following is a primary benefit of risk analysis?
A. Reduction in project costs
B. Overall reduction in project risk
C. Transfer of project risk
D. Decreased liability
B. Overall reduction in project risk
What are the two aims of tort law?
Compensate for injury to person or property, deter others from doing the same
Describe the difference between standard of care and duty of care.
Standard of care same as the average.
Duty of care obligation that others are not harmed.
Under tort law, the nature of the conduct of the person who caused the harm is irrelevant.
A. True
B. False
B. False
What is consideration in the context of formation of a contract.
Something exchanged for something else. A promise must be exchanged for adequate consideration.
Which of the following is Not an essential requirement when communicating acceptance of an offer, in order to create a valid contract? The acceptance must be:
A. Clear, B. Certain, C. Agreeable, D. Unconditional, E. Made by the person to whom the offer is intended.
C. Agreeable
An effective rainscreen system should help prevent moisture from being driven into a wall by vapour pressure.
T or F
F
Describe 2 strategic objectives to start the process for selection of building materials
What is required, what is available
List two resources that are useful in seeking material information
ULC, 4 Specs
It is generally acceptable to use the terms “equal, similar”, or “equivalent” in the technical specification of a Project Manual. T or F
F
Life cycle assessment groups product life into four primary phases. Which of the following is Not on of those primary phases.
Raw material acquisition, manufacturing, transportation / distribution, use/reuse, recycle / waste management
Transportation / distribution
List two parties who may perform site reviews of a project during construction?
Contract administrator, contractor
Which part of the construction contract describes the procedural requirement for submitting and certifying the contractors payment applications.
General conditions
The consultant generally takes the role of the contract administrator
a. True
b. False
True
Explain what a CA needs to know about standards in construction contracts
Be aware of why the standard is being called for and it is appropriate. How to research standards being quoted and how the choices selected apply or affect construction.
Work breakdown and organization structures to define scope and responsibilities are developed at which of the following stages in time management?
A. Detailed scheduling
B. Monitoring and control
C. Planning and definition
D. Organizing
Planning and definition
Which of the following does Not apply to a bar chart schedule.
A. Could be a Gantt chart
B. Is a graphic display of schedule related information
C. Uses horizontal bars to show activity duration
D. Uses critical path logic
D. Uses critical path logic.
Explain float in terms of scheduling:
The amount of time that an activity may be delayed without delaying the project finish date.