contract shit Flashcards
AFP
Alternate financing and procurement expand on the number of stakeholders involved in the design-construction project during design, thereby increasing project risks and the probability of change.
IPD
integrated project delivery expand on the number of stakeholders involved in the design-construction project during design, thereby increasing project risks and the probability of change.
work breakdown structure 5 types
Gantt Chart
Milestone Chart
Activity List
project network diagram
these are to determine critical path
fast tracking compared to crashing, pros and cons
fast tracking and crashing is meant to ensure the critical path is hit, or even reduce the critical path.
crashing involves adding additional resources to a task to complete it faster. you should add resources at the lowest rate of cost and increase adding rates as required.
fash tracking si doing work in parrell, such as puring foundations while doing second floor design.
types of specifications
prescriptive or performance or a combination of both.
prescriptive specification and what sector (public private) uses this type more
w
to choose a b or c architect list approved solutions to a spec. public secotr likes specified
performance specification what sector (public private) uses this type more.
based on a discription of performance alone and not neceaarily a prescribed choice. this allow contractor to chose their own system and material. private likes the competition
name the 5 contract types and what ccdc goes with each
1 Design Bid Build (CCDC 2 stipulated price agreement, CCDC 3 Cost Plus and CCDC 4 Is Unit Price.
- Design Build - CCDC 14 is design build stipulated price contract and CCDC 15 design building and consultant ( subcontractor) contract.
- Construction management CCDC 5a and 5b . CCDC 5a is for services only, and ccdc 5b is services and work.
- public private partnership (3p). has no direct contract.
- Integrated project delivery. CCDC 30. integrated project delivery.