constrution integrated manufacturing Flashcards

1
Q

What is construction integrated manufacturing also known as?

A

Off site or modular construction

This term emphasizes that construction occurs away from the final building site.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is a characteristic feature of modular construction?

A

All is built off site and then brought to site for installation

This process allows for more controlled construction conditions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are 3D volumetric modules?

A

A very modern form of off-site construction

These modules are also applicable in civil engineering.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How are prefabrication, modular, and volumetric construction related?

A

They are often used interchangeably, but have subtle differences

Understanding these differences can help in selecting the appropriate construction method.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What does prefabricated construction refer to?

A

Structures designed and produced under factory conditions before being sent to site

This process enhances efficiency and reduces on-site construction time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What does modular construction involve?

A

Framework or structure in which smaller units (modules) are assembled on site

This method can lead to faster construction times and reduced waste.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Fill in the blank: Modular construction consists of some sort of _______.

A

[framework or structure]

This framework supports the assembly of smaller modules.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

True or False: Modules in modular construction are often prefabricated on site.

A

False

Modules are typically prefabricated off site before assembly.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly