With regards to West Quay Retail Park, what was the existing glazing to the front elevation?
A
- Thermal boards and toughoned double glazed curtian walling certally with capped transoms and mullions.
2
Q
With regards to Baker Street, how did you provide accurate budget costs?
A
- BCIS/SPONS
- Bank has internal costing system
- Senior colleague
- Case studies
3
Q
With regards to Abbey Wood, Kings Hill what was the current height of the raised access floor system, and why would it need to be altered?
A
- Considering the property was a Cat B Fit-out as a data centre, the raised access floor system was 750mm (610mm - 1220mm).
- The Feasiblity is for an office which tends to have a raised access floor system between 100mm and 250mm.