Construction Finald Flashcards

1
Q

A vertical culvert is a

A

Wet Well

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Bigger pump house because of

A

Fertigation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Centrifugal pumps need to be ______ and only pump about ______

A

Primed & 12 ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Vertical turbine pumps does not need to be ______ and can pump up to _____

A

Primed & 1000 ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Flooded Suction is

A

When the water source is above the pump house

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

You cover a pond liner with ______ of sand to protect it from _________

A

9-12 inches & UV Rays Sunlight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Three things for a successful pond.

A

Water in, water out, Water move

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Cart path twist should be

A

“gentle twist” 60-75’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Cart path should be at least ____ wide, remove ____ of top soil, put ___ of base, roll ______ layers

A

8ft
6in
4in
all three

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

A bulk head has to be made with

A

tongue and groove materials

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Each layer of a wall should be

A

“battered back”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

A gabion wall is

A

a galvanized steel container filled with rocks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Walls cost

A

$50 per ft2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Oil was added to old school sand greens to keep anything from growing on them

A

keep anything from growing on them

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

You cannot rototill _________ into sand

A

Peat Moss

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

You can rototill sand into topsoil but should?

A

test undisturbed soil sample

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

First 12 months after seeding what are rates of N & P that should be applied

A

10-12 lbs of N per 1000ft2 and 3 lbs of P per 1000ft2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Bent grass should always be spread with a drop spreader

A

drop spreader

19
Q

USGA greens create a

A

perched water table

20
Q

Cost for a new USGA green not including any bunker work

A

$35,000-70,000

21
Q

a long range plan which suggests changes and improvements, as funds and time permit?

A

A master plan

22
Q

Basics of master planning

A
Safety
Functionality
Playability
Strategy
Aesthetics
23
Q

three types of construction contracts

A

Lump Sum
Unit Price
Time & Material

24
Q

Entire project done for an exact amount of money?

A

Lump Sum

25
Q

Price for each item of work, drainage/sod etc. “the fairest type of contract”

A

Unit Price

26
Q

Contractor charges per hour. “not recommended”

A

Time & Material

27
Q

be sure to get a ______ “as built” drawing/plan

A

GPD

28
Q

a master plan does not include ?

A

Drawings

29
Q

How long does it take to develop a master plan

A

3-9 months

30
Q

Cost to complete/carry out a master plan without irrigation

A

1.2 million

31
Q

Make sure you plant trees at least _____ yards off of the fairway

A

10

32
Q

The best machine to help prepare a seed bed

A

A Harley Windrower

33
Q

Sod growers use a __________, has a sheep’s foot to compact

A

Brillion Seeder

34
Q

Has no seed in the mulch being sprayed

A

Hydro mulching

35
Q

Is Hydro seeding is a good idea?

A

No

36
Q

When do you Hydro mulch after seed has already been put down or before?

A

after

37
Q

Always be sure to get good ___________________ when seeding anything

A

seed & ground contact

38
Q

Always make sure that your seed is

A

certified seed

39
Q

Rip Rap is

A

6-12” angular rock

40
Q

When using erosion mat, make sure you get the?

A

bio-degradable stuff with no netting

41
Q

Super silt fence is

A

A stronger type of silt fence

42
Q

A pin placement is a _______ circle with a slope of less than _______

A

300 ft2 & 3 1/2%

43
Q

Today’s cost to build a golf course is ________ for a general type of architect

A

5-8 million

44
Q

Cost to build a golf course with a fancy architect like Fazio is

A

15-20 million