Condensate Flashcards
What are the CBP auto starts?
- Low pressure at 325#
What is the flow capacity of the LP #1 heaters?
- Each string supplies 50% flow (We have 3)
What is the flow capacity of the LP #2-4 heaters?
- Each string supplies 80% flow (we have 2 strings) with a bypass that can provide 20% flow via CRV-224
What does CRV-55 do for you?
- Allows makeup from the CST to the Condenser Hotwells (Sensed on A and C hotwell lvl)
What does CRV-155 do for you?
- Allowd for excess condensate from hotwells to go back to the CST (Sensed on A and C hotwell lvl)
What does CRV-224 (2,3,4 Heater bypass valve) do?
- Allows having a heater string out and provides 20% flow
- Auto modulates open when MFP suction < 240#
- Trips open at 210# MFP Suction #
How do you reset CRV-224 (2,3,4 Heater bypass valve)?
- To reset, MFP Suction pressure > 260# and run controller to open
What do CRV-201-203 (Condensate Booster Pump Recirc Valves) do?
- Maintain 4000 gpm on running pumps
- ** Flow switch is on the common discharge header**
Where is the flow switch located for the Condensate Booster Pump Recirc Valves?
- ** Flow switch is on the common discharge header**
What do CMO-101(102) (SJAE bypass valves) allow?
- Manually position to achieve desired DP across SJAEs
- Prevents exceeding design flow of SJAEs
What does CMO-61 (SJAE and HWP recirc line valve) do for you?
- Provides continuous flow path from steam jet air ejector header to the main condensers to maintain minimum flow through the hotwell pumps and steam jet air ejector condensers
- 2400gpm min per pump
What suction pressure do the CRV-224 valves help to maintain?
- 210#-240#
What actuates hood spray in Unit 1 (CRV-102) and Unit 2(CMO-40)?
- Generator Load < 7.5%
- Turbine Speed > 900 rpm
- Manual
When does U-1 Hood Spray Terminate?
- All exhaust hood temperatures are < 160 °F,
- Generator load is > 12.5%
- Turbine speed is < 900 rpm
- 1-CRV-102 Fails CLOSED on loss of air or power.
- Manual
When does U-2 Hood Spray Terminate?
- CMO-40 will close if either SRV 26 and/or 27 are NOT full open
- 2-LPS-17 is < 30 psia.
- Generator Load > 12.5%
- Turbine Speed < 900 rpm
- CMO-40 fails AS IS on loss of power.