Which of the following determines the timing and quantity of material orders to meet the Master schedule?
Material requirements planning
In the context of master scheduling, confirmed customers demand for product is defined as
booked orders
In the context of master scheduling, the company’s best estimate of the demand in any period is
forecasted demand
A listing of all the subassemblies, intermediates, parts and raw materials that go into a parent assembly showing the quantity of each to make and assembly is
bill of material (BOM)
The master schedule record tracks several pieces of information. Which of the items listed is NOT typically apart of the master schedule?
projected labor levels
A system used when demand occurs in only a single point in time is the definition of
single period inventory systems
A company which produces electricity is considering buying extra coal to hold in inventory. They want to buffer against a potential strike at a major coal producer which would likely result in a significant price increase. This type of inventory id
hedging
An extreme change in the supply position upstream in a supply chain generated by a small change in demand downstream in the supply chain is the definition of
The Bullwhip effect
Companies holf hedge inventory due to
uncertainty in supply or demand
John Deere produces riding lawk mowers before peak demand because there is a mismatch between downstream demand levels and upstream production capacity. This type of inventory is
smoothing
A philosophy of manufacturing based on planned elimination of all waste and on continuous improvement of productivity is the definition of
Just-In-Time (JIT)
A temporary endeavor undertaken to create a unique product, service or result is the definiton of
a project
a production control approach that uses containers, cards, or visual cues to control the production and movement of goods through the supply chain is
kanaban system
an effort to shorten the overall duration of a project by reducing the time it takes to perform certain activities is known as
crashing
In the _______, project planners develop a broad description of what the project is and what its scope will be
concept phase