After the tracer wire, how many inches of compacted bedding is required?
4”
How many inches of compacted padding is required above the pipe?
8”
What is the minimum amount of passes per lift with a compactor
4
What pattern is used during compaction?
Starting around the perimeter, move inward towards the center in a spiral pattern
What tool is used to verify proper compaction?
DCP
(Dynamic Cone Penetrometer)
For standard excavations what is the minimum number of DCP tests?
Minimum of 1
Preferred 3
3” from the edge
For longer trench excavations what is the number of DCP tests required?
3 DCP tests evert 25’
What is the minimum number of drops for 95% compaction in rock and sand?