Codes, Standards And Building Code Flashcards

1
Q

Otherwise known as the National Building Code of the Philippines

A

Presidential Decree No. 1096

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Agricultural buildings is classified in_ in the National Building Code?

A

Group J

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

This is the office authorized to enforce the provisions of the National Building Code and its IRR in the field as well as the enforcement of orders and decisions made pursuant thereto.

A

Office of the Building Official (OB0)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A document issued by the Building Oficial to an owner applicants to proceed with the construction, installation, addition,
alteration, renovation, conversion, repair, moving, demolition or other work activity of a specific
project/buildings/structure or porions thereof after accompanying principal plans, specificaions and other pertinent
documents with the duly notarized application are found satisfactory and substantially conforming with the National Building Code of the Philippines and its Implementing Rules and Regulations

A

Building Permit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which of the following is true?

a. Building permit is requirer to be constructed
b. Building permit is required for buidings that are to be altered, repaired
c. Building permit is required for buldings that are to be demolished
d. All of the above

A

All of the above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Building permits should be obtained from

A

Building Officials

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The building permit has validity if construction work is not commenced from the date of such permit.

A

1 year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

After securing a building permit, initial construction of the structure was done. Then suddenly the construction activity
was put to stop due to some unexpected reasons. How many days will be the validity of such Buiding Permit in order
to resume construction work without obtaining new permit?

A

120 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The aplicable provisions of the various agencies and technical professional codes that are supplementary to the
National Building Code of the Philippines.

a. National Structural Code of the Philippines
b. National Plumbing Codee of the Philippines
C. Philippine Electrical Code
D.Referral Code
e. All of the above

A

Referral Code

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Types of auxillary permits in building pemit application except

A. Mechanical Permit 
b. Electrical Permit
C. Sanitary Permit
d. Electronics Permit
 e. None of the Above
A

None of the Above

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The required number of sets of building plans, specifications and other documents prepared during application for
building permit

A

5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

It Is a set of documents required in building permit application tabulating the detail list, quantity and cost of materials.

A

Bill of materials

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

It is a writen technical description of materials, equipment, construction systems, standards, and workmanship in
conjuncion with the drawing that details the requirement for acceptable completion or work.

A

Specification

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

It is a test report required to determine the soil bearing capacity.

A

Geotechnical report

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

It is a document for building permit that is about the zoning of the buildings.

A

Location clearance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Which of the following documents are not required for one-storey buildings?

a. Drawing plans 
b Structural analysis 
C. Bill of Materials
d. Specifications
e. None of the above
A

Structural analysis

17
Q

It is a drawing view in a building plan that shows for if there are changes in the elevation inside the building.

A

Section view

18
Q

Which of the following statement is not true?

a. The drawing plan shows the dimensions and locations of various structural members
b. The drawing plan specifies the type of concrete to be used for a structural member.
c. The drawing plan shows the electrical schedule for branch circuits and wire sizes
d. The drawing plan may or may not include plumbing layout depending upon the requirements

A

The drawing plan specifies the type of concrete to be used for a structural member.

19
Q

What is the designated letter used for Agricultural sheets in building plans.

A

None assigned yet

20
Q

It is a part of a building plan showing the positioning of electrical outlets and its branch circuitry.

A

Power layout or Lighting Layout

21
Q

Structural analysis are required for structures exceeding ____ storey building

A

1

22
Q

NSCP stands for_

A

National Structural Code of the Philippines

23
Q

In the Philippines, the organization that sets the structural code?

A

Association of Structural Engineers of the Philippines

ASEP