CMGT Flashcards

1
Q

The footing of a building should always be placed above the frost line

A

False. It’s below

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The friction pile is driven to the point of refusal

A

False. It’s ‘A end beaning pile…’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

NIST is the organization that developed MastorFormat

A

False. CSI – Construction Standard Institute developed MastorFormat.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

LEED is the most common green building rating system in the United States.

A

True.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Loads from rain or snow are considered part of the hydrostatic loads on building

A

False, Rain or snow are considered live loads.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

A slurry wall is the least expensive form of shoring an excavation

A

False, its most expensive.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The zoning code determines the fire rating of building components.

A

False, the of area building. The distance from the property line.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The International Building Code and International Residential Code are the model building codes adopted in all 50 states

A

True.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The owner selects the project delivery method and payment structure for a given construction project

A

True.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Obtaining LEED certification for a new building is the sole responsibility of the architect designing the project.

A

False, its the responsibility of the Architect, Engineer, constructors, mechanics, all the team.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

A slab on grade, stepped footing, and column footing are all examples of deep foundations.

A

false, it’s an example of shallow foundations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

A firm fixed price (lump sum) payment structure is most commonly used with design/bid/building projects

A

True.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Rock

A
  • Strongest
  • most stable
  • carry heavy load
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Boulder

A
  • Large pieces of rocks
  • Classified by size
  • two arms to carry
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Cobble

A
  • Smaller
  • Hold it with one hand
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Gravel

A

Smaller

17
Q

Sand

A

You can see particles but too small

18
Q

Silt

A
  • to just get one you’ll need a microscope
  • Cubic shape
  • Finer
19
Q
A