Company Officers must consider all buildings in their administrative area as
potential CIDS buildings. In considering a building they must look for conditions
that would not be immediately apparent to arriving units.
It is mandatory that every building that is listed as a What be included in the CIDS program ??

A
Bowstring Truss (BWSTRG)
CFR Hold (CFRH)
Major Alteration (MJALT)
Pre-Incident Guideline (PG)
Rehabilitated (REHAB)
Sec 4.3.1
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Transmitted Data
This is the portion of the CIDS entry that will appear g priority order
What is this order ?

A
  1. FD DESIGNATION
  2. OCCUPANCY
  3. DESCRIPTION OF BUILDING
  4. DESCRIPTION OF THE DANGEROUS, HAZARDOUS OR UNUSUAL CONDITIONS
    5.MINRESP
    Sec 4.4.2 D
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Many newly constructed or renovated buildings do not conform
to the construction classifications of the 1938 building code and
are constructed using Light-Weight Construction Materials.
To assist in identifying these structures, 3 additional construction
classifications have been added for use as follows:

A

 CL2LW A building constructed of metal “C” joist or steel bar joist.

CL3LW A Class 3 building renovated or repaired using any type of structural Light-Weight materials

 CL4LW A wood frame building using wood truss construction or
laminated I beams
Sec 4.4.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Only the administrative unit shall submit or revise CIDS entries for buildings within
their administrative district. Units discovering a potential CIDS entry for buildings not
located within their administrative district shall notify the administrative unit of the particulars within 24 hours
Agree or Disagree

A

Disagree!!
Immediately!!
Sec 4.5.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When a company officer becomes aware of a facility that does not require the response of
a CFRD Company because they have trained personnel, oxygen, and defibrillation
equipment available, the officer can request a “CFR Hold” (CFRH) for that facility
Therefore we will not respond for All segment call types ?
Agree or Disagree

A

Disagree!!!
Therefore, for segment one type calls classified
as cardiac arrest or choking, CFRD units WILL respond to facilities listed and approved as
CFRH in CIDS. For all segment two and three requests, the CFRH will be in effect and
no CFRD unit will be dispatched.
Sec 1.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

In order to remove the facility from the response matrix, the company officer shall ensure
that the facility meets all the following criteria:
What are they ??

A

 On duty personnel are trained in CPR.
 Trained personnel are able to provide oxygen to the patient.
 On duty personnel are trained in the use of a defibrillator, and all the necessary
equipment is available to the trained personnel.
 All equipment and appropriately trained personnel are available during all hours of
operation.
Sec 2.1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Complete a Request for Removal of Medical Facility from CFR-D Response
Matrix electronically using the eCIDS application.
What form is that ?

A

CD-202

Sec 3.1.4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Once a medical care facility is on HOLD, How often is this re evaluated to verify that the facility still meets the required criteria for the CFRH ??

A

Each time the facility is inspected, the administrative unit shall verify that the facility still
meets the required criteria for the CFRH.
Sec 3.2