Chapter 9 final Flashcards
Traditional product costing system
uses a predetermined allocation rate (ex, machine hours, direct labor hours, or direct labor dollars)
Traditional/Plantwide allocation method
uses one cost pool for the entire plant as in a single stage approach; it uses one overhead allocation rate
Acitivity-Based Costing (ABC)
is a two-stage product costing method that first assigns costs to activities and then allocates them to products based on each product’s consumption of activities
- ABC is based on the concept that products consume activites and ativities consume resources
Activity-Based Costing provides more detailed
measures of costs than do traitional/plantwide allocation method
Acitivity Base Costing has more
cost pools and more cost assignment bases than the traditional/plantwidemethid
Activity Based Costing provides more information
about product costs, but requires more record keeping (cost/benefit tradeoff)
Activity based costing recognizes that overhead costs
are caused by activities and that activities may not be cause solely on volume