Chapter 9 Flashcards

1
Q

A specific logical collection of authorized work for vessel labor that is uniquely identified, scheduled, budgeted and assigned to specific cost centers for accomplishment is a(n) ___.

A

Work order

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

___ is a documented system used to identify, correct, and prevent conditions that creae excessive costs, unsatisfactory work performance, hazardous conditions, or undesirable trends.

A

Corrective action request

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What phase of construction (where) is the scope of work on work order number 6172-253-A scheduled to be worked?

A

Shop area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A ___ is assigned to a specific cost center and is used to report earned value management system (EVMS) data.

A

Engineering change notice

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Under the bill system, work packages are identified using a ___ that identifies specific information about the ship, the system, and the type of work to be completed.

A

22- digit number

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

A(n) ___ work order outlines different work order biling descriptions that ensure charges are assigned to the correct account within the shipyard. The work shown on this type work order could be done in a fabrication shop, integrated area, or the wet dock.

A

Numerical- type

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

A(n) ___ work order is designaed for inverted and ship shape unit pre-outfitting prior to erection.

A

Alpha-type

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

In the event rework is needed, a(n) ___ is completed by craft management to coordinate the completion of rework. It includes information such as work description, root cause, and defect code.

A

Rework collection form

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A Ripout (RO) is generated by the requesting craft, Test and Trails, or the ship construction manager using the ___ system.

A

Quality information

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

___ is responsible for determining material availability and releasing Work Orders to craft.

A

Production Control

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

A ___ view in a drawing is a cut from the three main views of an object. It is drawn for the purposte of revailing necessary information that may not be clearly shown in the three views independently.

A

Detail

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The ___ view of a ship is looking forward or aft.

A

Section

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The ___ view is used to show the relative location of the part, and is particularly helpful to assemble complet objects.

A

Exploded

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

___ views give a clearer view of the interior or hidden features of an object that cannot be seen clearly in other views.

A

Sectional

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

A(n) ___ projection is one in which the projector are other than perpendicular to the plane of projection.

A

Obliquie

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

A ___ is used to eliminate the need to draw extra views of rolled shapes, ribs, and similar forms.

A

Broken-out section

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

A(n) ___ section view shows parts such as ribs or spokes as if they are rotaed into or out-of the cutting plane.

A

Aligned

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

A(n) ___ section cutting plan changes direction backward and forward (zig-zags) to pass through all the features of an object.

A

Offset

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

A drawin that shows a single component/part and includes a complete description of the component/part is referred to as a ___ drawing.

A

Detail

20
Q

___ work is the largest section of work orders at Ingalls Shipbuilding.

A

Planned

21
Q

A ___ is used to coordinate and correct an error associated with a work order.

A

Request for service

22
Q

A ___ work order authorize construction services to carry out work such as rigging, scaffoldin, supervising, or special manufacturing to be accomplished in the shipyard.

A

Support

23
Q

When each work order is complete, its ___ is updated to keep track of progress and update the flow of material down the producion line.

A

Status

24
Q

A(n) ___ is a document that records or authorizes a change to a design. They are utilized for Class I and Class II changes for a ll contracts and design devevlopment or design correction changes that are NOT the result of a request for service.

A

Engineering change notice

25
Q

___ work includes Class II work order changes that result from an engineering change notice.

A

Unplanned

26
Q

In the Work Order number “2486-6172-E05-1-610-842-4300,” 2486 refers to the ___.

A

Hull number

27
Q

The three stages of a work order are complete, ___, and reinspection of reject.

A

Partial

28
Q

Revised views prompted by an Engineering Change Notice should identify the area affected on the drawing(s) by encircling/clouding the changed area and labeling with the corresponding ___.

A

was/is

29
Q

In the Word Order number “2486-6172-E05-1-842-4300,” 842 refers to the ___.

A

Cost center

30
Q

In the event rework is needed, a(n) ___ is complete by craft management to coordinate, the completion of reowrk. It includes information such as work description, root cause, and defect code.

A

Rework control report

31
Q

___ is responsible for determining material availability and releasing Work Order to craft.

A

Production control

32
Q

Metric dimensions are listed as fractions in blueprint drawings.

A

False

33
Q

Standard dimensions are listed as whole numbers in blueprint drawings.

A

False

34
Q

Notes about a specific part are usually pointed out on a blueprint with the use of detail or section lines.

A

False

35
Q

General notes provide any/all pertinent information not provided in the graphics of the blueprint.

A

True

36
Q

The reference block provides a list of reference materials that were used to create the blueprint.

A

False

37
Q

Quality critieria for material, standards o workmanship, or prescribed methods of construction are all examples of specifications that may be included in a drawing.

A

True

38
Q

What is the purpose of notes, specifications, and dimenstions on a blueprint drawing?

A

Identify important details to enable parts to be manufactured, add detailed reference information to the blueprint drawing, provide acceptable standards for construction

39
Q

____ is a statement or document that can be attached to the blueprint containing a description such as the terms of a contract or detail of an object not shown on the blueprint.

A

References

40
Q

___ serve two important purposes on a blueprint, provide size and/or spacing requirments for fabrication of components and the location where components should be place.

A

Dimensions

41
Q

What is the purpose of the scale block on a blueprint?

A

Shows the size of the ship model

42
Q

What is the purpose of surface texture information?

A

To identify the surface finish of materials

43
Q

What area of a drawing should be refered to in order to interpret the surface texture of a piece/part?

A

General notes

44
Q

What is the purpose of the text associated with a cutting plane line?

A

Refers the reader to specific pages, zones, or details within the same drawing or additional information and views

45
Q

The revision symbol is a ___.

A

Triangle

46
Q

The revision coloumn provides a list and description of all changes made to the drawing since its inital issue. It also includes other information such as what authorized each change and ___.

A

The sheet/ zone location of each change

47
Q

An area titled ___ on a blueprint indicates information is pending.

A

Reservation block