Chapter 6 Flashcards
If a Phase ___ Environmental Site Assessment indicates soil or groundwater contamination, site remediation must occur.
Pg. 92
ll
A building ___ is the perimeter of a building as it meets the land on which it occupies.
Pg. 93
footprint
SS Credit-Open Space requires project teams to provide outdoor space greater than or equal to ___ of the total site area.
Pg. 95
30%
There are ___ additional healthcare credits in the SS category that build off the idea of providing accessible open space.
Pg. 95
2
The most popular choice of pervious surface for rooftops is the ___ roof.
Pg. 97
green
A(n) ___ is a collection of rocks or boulders held together using wire mesh or metal fabric material for the purpose of reducing soil erosion.
Pg. 98
gabion
___ is caused by high-angled front lighting.
Pg. 101
Glare
___ ratings offer a quick and useful way for project teams to assess and select lighting options with minimal impact.
Pg. 102
BUG