Chapter 4 Ladder Company Ops Flashcards
When the search of a too has been completed, the door to the room shall be?
Kept closed until the main body of fire has been extinguished
Immediately upon entering the room from a window, members should?
Make a quick check/sweep of the floor in the hall outside the door for any victims before closing the door.
A quick determination as to whether a structure is balloon frame is to remove a baseboard on an _____ wall and check for a presence of a _____.
EXTERIOR wall and check for presence of SOLE PLATE
In platform construction the exterior wall studs extend only from the floor to the ceiling of each individual floor, they are capped at the ceiling level of each floor with a?
Top Plate
All exterior ventilation (Horizontal and Vertical) must be controlled, communicated and coordinated by the?
Ladder Company Officer inside the fire area to be vented
For a PD fire who ensures that the cellar is examined for fire?
2nd due Ladder Company ensures that cellar is examined for fire
*First due ladder ATTEMPTS and examination of cellar
Peak roof ventilation if needed is performed by?
2nd due Ladder Company
Shut down of utilities at a PD fire is performed by?
2nd due Ladder Company
At cellar fires, if the first ladder did not advance into the cellar, and the second hoseline has been stretched via a secondary entrance, where does 2nd due ladder inside team go?
Perform search and examination of he cellar using this secondary entrance in coordination w/ the engine company
After gaining entry through the entrance door chosen, the door shall be?
Controlled in a closed position (unlocked) by a member of the interior team. The door chalk be controlled until the fire area can be further isolated or a charged hoseline is advancing through the door to extinguish the fire
Tool assignment peaked roof PD, first due Can and FE firefighters?
FE: axe and halligan
Can: extinguisher and 6’ hook
*Second due inside team is same tool assignment
First due Members proceeding to the side or rear must visually examine cellar windows to determine fire conditions. All observations must be reported to?
Ladder Company Officer AND IC
Members of the first ladder outside team should initiate removal of window bars on?
BOTH the front and rear of building early in operations if conditions allow
Peaked roof PD Roof/OV tool assignment?
Portable ladder, 6’ Halligan hook and/or Halligan for each member
*same tool assignment for 2nd due
Peaked roof PD Roof/OV Duties?
Quick Perimeter survey, if no life hazard then VEIS of an area on an UPPER FLOOR that is most likely to be occupied. Coordinated with inside team.
Peaked roof PD Chauffeur tool assignment and position?
Tools: Appropriate size ladder to reach upper floors and necessary hand tools.
Position: Front or side
- In situations where size up indicates an obvious occupied attic, 1st LCC may utilize the aerial or TL to perform VEIS of attic
- Prior to entry team up w/ 2nd due LCC
- Position aerial to cover both sides