Jen has been contracted to redecorate the lobby of a mixed use building. She will work with the contractor to tear out the existing furnishings, wall coverings, and light fixtures, and will dispose of any hazardous materials based on environmental regulations. According to the resource conservation and recovery act (RCRA), who is liable for any subsequent problem or future hazard?
A. Jen
B. The contractor
C. The building owners
D. The disposal company
C. The building owners
What does a phase 3 ESA accomplish?
The design and implementation of active and passive measures to remediate identified contamination at the site
The facilitation and preparation of all necessary reports and permits to achieve for mediation of the site to appropriate clean up standards
What is the scope of an ESA and an ECA?
They provide a snapshot in time of the facilities potential environmental liability.
A one time ESA does not typically identify every EHS issue particularly attendance environmental compliance, new dedication requirements for the EHS implications of new equipment like storage tanks.
ECAs must be performed on a regular basis to ensure that the facilities compliant status is up-to-date
What is the RCRA liability of entities that handle it hazardous waste?
Liability cannot be transferred from generators of hazardous waste even to properly certified waste disposal companies. Regardless of how they are disposed of, legally and carefully, any subsequent problem for future has her determination can be used as a basis of lawsuits against the original generator.
Describe the four goals of GSR.
Minimizing total energy use in promoting the use of renewable energy for operations and transportation
Preserving natural resources
Minimizing waste generation while maximizing materials recycling
Maximizing future reuse operations for remediated land
What is the purpose of RCRA?
RCRA -resource conservation and recovery act
Establish rules pertaining to hazardous waste generators in transporters, as well as the owners and managers of hazardous waste treatment, storage, and disposal facilities
Responsibility for administering the act lies with the EPA which makes regulations to implement it
(Fill in the blank)________ Is included in the super fun to indicate there any individual potentially responsible party (PRP) can be held liable for the entire cost to clean up the site, even if they only contributed a small amount to the overall contamination.
A.. Mutual liability
B. Shared an assigned liability
C. Collective liability
D. Joint and several liability
D. Joint and several liability
As lead engineer at the hospital, you support self audit policies and perform them regularly to check for environmental violations, and to take advantage of EPA supported incentives. Which of the following is NOT an incentive offered to owners and managers perform self audits?
A. Opt out of future site assessments
B. Significant penalty reductions
C. Extended time to correct violations
D. No recommendation for criminal prosecution
A.. Opt out of future site assessments
Describe the purpose of an ECA.
It is meant to ensure the potential liability exposures are minimized or illuminated by ensuring the ongoing operations in activities are in compliance with environmental regulations.
During the dude – process, and assessment was performed to identify recognize environmental conditions (REC’s) by evaluating the used, storage, treatment, or disposal of hazardous materials. Subsequently, it must be determined whether contamination is present on site, and likely source of the contamination must be identified through another investigation. What types of ESA’s have been performed?
A. Phase 1 and phase 3.
B. Phase 1 and phase 2
C. Phase 2 and phase 3.
D. Phase 1 and phase 4
B. Phase 1 and phase 2
Explain joint and several liability.
A situation in which liability is shared in that allows any one of the responsible parties to be held liable for the entire obligation.
The ESA investigation can be broken down into which of the following for major porch?
A. Current, future, primary, secondary
B. Primary, secondary, past, present
C. External, internal, current, future
D. Past, present, external, internal
D. Past, present, external, Internal
Explain the scheduling of an ESA versus an ECA.
Phase 1 ESA is typically initiated by a buyer as part of property due diligence.
And ECA is initiated by the owner. It’s done periodically to ensure proper ongoing operations or perhaps in anticipation of a sale or lease, and specifies corrective actions as they occur.
Which of the following regulations established rules specifically pertaining to the generators, transporters, and owners of hazardous waste in the duration of their liability for the waste?
A. Superfund amendments and re-authorization act (SARA)
B. Resource conservation and recovery act (RCRA)
C. Comprehensive environmental response, compensation, and liability act (CERCLA)
D. How’s your test and solid waste amendment act (HSWA)
B. Resource conservation and recovery act (RCRA)
Compare the focus of the ECA with the focus of the ESA.
ESA is focused on the buy/sell portions of the property life cycle
ECA is focused on the activities and operations portion of the life cycle