Chapter 2 - System Life Cycle Concepts, Models and Processes Flashcards

1
Q

An IPO Diagram includes the following:
A) all inputs, process activities, and possible outputs
B) key inputs, process activities and resulting outputs
C) all inputs, predictable activities and required outputs
D) key inputs, process activities and possible outputs

A

B) key inputs, process activities and resulting outputs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The number of process groups identified by 15288 is (choose 1):

A) 3
B) 4
C) 5
D) 6

A

B) 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Project direction, as found in the Controls box of the input-process-output (IPO) diagram, is defined as (choose 1):

A) a vector defining the success criteria for a project.
B) the organisation’s direction to a project to continue, redirect, or terminate.
C) a measurement against assessment criteria that determines if a project is moving forward or stalled.
D) permission to continue forward at the conclusion of a phase-gate or stage-gate review.

A

B)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The 5 Organisational Project-Enabling Processes identified by ISO/IEC 15288 include (choose 3):

A) Technical Processes
B) Infrastructure Management
C) Agreement Processes
D) Human Resource Management
E) Quality Management

A

B, D, E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How many items are called out in the Controls box (choose 1):
A) 5
B) 4
C) 7
D) 6

A

C - 7

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The 5 Organizational Project-Enabling Processes identified by ISO/IEC 15288 include (choose 2):
A) Portfolio Management
B) Agreement Processes
C) Life Cycle Model Management
D) Technical Processes

A

A, C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Select the Controls from the list below (choose 7):
A) Applicable laws and regulations
B) Organisation policies
C) Project controls
D) Organisation infrastructure
E) Project constraints
F) Standards
G) Agreements
H) Project infrastructure
I) Project direction
J) Knowledge management
K) Project control requests

A

A, F, G, B, I, E, K

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The 4 process groups from ISO/IEC 15288 that support systems engineering include (choose 2):
A) Organisational project-enabling Processes
B) Work breakdown processes
C) Technical Processes
D) Project Initiation

A

A C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The input-process-output diagrams represent (choose 1):

A) the best way to perform systems engineering processes.

B) the fact that systems engineering must produce the documents listed in the output

C) one way the systems engineering processes can be performed

A

C

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The 8 Technical Management Processes include (choose 4):
A) Project Planning
B) Project Assessment and Control
C) Requirements Analysis
D) Configuration Management
E) Implementation
F) Stakeholder Requirements Definition
G) Information Management

A

A B D G

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the typical life cycle stages?
A) Concept, Development, Production, Utilisation, Support, Retirement
B) Concept, Development, Production, Operation, Support, Retirement
C) Concept, Development, Constuction, Operation, Support, Retirement
D) Development, Prodcution, Operation, Support, Renewal

A

A

INCOSE handbook pg27

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the typical goals of decision gates? (Choose three)
A) The project deliverables satisfy the business case.
B) Decide what needs to be done in the next stage.
C) Unresolved issues that need to be addressed in that state are addressed.
D) The project deliverbales satisfy the client requirements.
E) Increase in systems maturity is within the defined threshold.
F) Identify risks through review of the design.

A

A, C, E

INCOSE handbook pg29

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is a technical review in accordance with ISO/IEC 24758 / IEEE 15288.2?
A) A review of notes, documents, and other data that forms the basis for a scientific conclusion.
B) Activities to assess the quality of the documentation produced compared to the client ask.
C) A detailed review of processes, product definition information, documented verification of compliance with requirements, and an inspection of products to confirm that products have achieved their required attributes or conform to released product configuration definition information.
D) A series of systems engineering activities conducted at logical transition points in a system life cycle, by which the progress of a project is assessed relative to its technical requirements using a mutually agreed upon set of criteria.

A

D

INCOSE handbook pg31

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is an audit in accordance with ISO/IEC 24758 / IEEE 15288.2?
A) A detailed review of processes, product definition information, documented verification of compliance with requirements, and an inspection of products to confirm that products have achieved their required attributes or conform to released product configuration definition information.
B) A series of systems engineering activities conducted at logical transition points in a system life cycle, by which the progress of a project is assessed relative to its technical requirements using a mutually agreed upon set of criteria.
C) Essential activities to ensure that the system meets the requirements, standards, and expectations of the stakeholders throughout its lifecycle.
D) Verificaiton that the requirements have been meet at each stage.

A

A

INCOSE handbook pg31

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the 3 baselines? (Choose 3)
A) Functional
B) Allocated
C) Standards
D) Product
E) Requirements

A

A, B, D

INCOSE handbook pg32

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What do technical reviews/audits provide the opportunity to assess? (choose 3)
A) the SoI is an at an acceptable level of risk
B) the SoI conforms to ISO/IEC 24758
C) the SoI has tracebility through the stages
D) the SoI is meeting its requirements
E) the SoI will have acceptable quality characteristics (QCs)
F) the SoI captures all components of a system

A

A, D, E

INCOSE handbook pg32

17
Q

What are good practices for technical review and audits? (choose three)
A) review only what is in scope for the review
B) consider ‘dry runs’ to make review efficient
C) include only the members of the team deemed nessessary
D) establish clear entry/exit criteria
E) allow for free form discussion
F) application of multiple instances of the review and audits, at multiple levels of system hierarchy and incremental

A

B, D, F

INCOSE handbook pg32/33

18
Q

What are the three types of life cycle models and their characteristics?
A) Sequential, Incremental, Evolutionary
B) Waterfall, Agile, Vee
C) Time bound, Scope bound, Cost bound
D) Dynamic, Lean, Spiral

A

A

INCOSE handbook pg33

19
Q

What factors/considerations may influence the section of adaption of life cycle model (as per Clause 6 of ISO/IEC/IEEE 24768-1) (choose 4)?
A) emerging technology opportunities
B) value it can add
C) risks, commercial or performance, to the concern of stackholders
D) availability of the services of enabling systems
E) the need to conform to requirements
F) suppliers capabilities
G) the need to conform to other standards
H) intergation issues throughout the life cycle of the system

A

A, C, D, G

20
Q

Which of the following are not components of an IPO diagram (Choose 2):
A) Inputs
B) Outputs
C) Processes
D) Controls
E) Variables
F) Enablers
G) Activities

A

C) Processes
G) Activities

(Page 42)

21
Q

Which of the following are types of system life cycle processes (Choose 3):
A) Sequential
B) Iteration
C) Infinite
D) Recursion
E) Concurrency

A

B) Iteration
D) Recursion
E) Concurrency

(Page 44)

22
Q

What is the purpose of the Infrastrucutre Mangement Process?
A) Provide the infrastrucutre and products to projects to support organisation and project objectives throughout the life cycle
B) Provide the infrastrucutre and services to clients to support organisation and project objectives throughout the project start up
C) Provide the infrastrucutre and services to projects to support organisation and project objectives throughout the life cycle
D) Provide the infrastrucutre and services to clients to support organisation and project objectives throughout the life cycle
E) Provide the infrastrucutre and products to businesses to support organisation and project objectives throughout the project start up

A

C) Provide the infrastrucutre and services to projects to support organisation and project objectives throughout the life cycle

(Page 54)

23
Q

A key characteristic of the Incremental Commitment Spiral Model (ICSM) is (choose 1):

A) sequentially addressing requirements and solutions
B) internal team decisions regarding risks and risk mitigation plans
C) concurrently addressing requirements and solutions
D) delaying the consideration of human factor aspects to later stages

A

C) concurrently addressing requirements and solutions

24
Q

A key mechanism for delivering the direction component of velocity in IID methods is (choose 1):
A) continuous integration
B) rapid successive deliveries
C) flexibility on event sequencing
D) incorporation of stakeholders into the working-level teams

A

D) incorporation of stakeholders into the working-level teams

25
Q

A pitfall with the rigorous plans and documents required by modern certification standards is (choose 1):
A) a false sense of security in the actual system is created by complete documentation
B) a sophisticated configuration management system is required to maintain coherent documentation
C) significant costs may be incurred trying to keep plans and documents up to date on project undergoing significant change

A

C) significant costs may be incurred trying to keep plans and documents up to date on project undergoing significant change

26
Q

Business aspect issues include (choose 3):
A) funding
B) product
C) cost
D) affordability
E) market demand
F) realistic schedules

A

D) affordability
E) market demand
F) realistic schedules

27
Q

Conway’s Law states that “organisations are constrained to produce designs that are copies of” this:
A) the communication structure of the organisation
B) the stated organisational hierarchy
C) the organisation’s quality processes
D) the organisation’s regulatory oversight body

A

A) the communication structure of the organization