Chapter 15 Flashcards
New fire Apps are tested upon completion and for the periodically for its _____ service life
entire
The two categories of testing are grouped as:
_______ and _______
preservice and performance tests
The D/O is usually not involved with the _______ test, however knowledge of the criteria and standards for these tests with aid in understanding performance tests, which the D/O is often involved in.
preservice
Preservice tests include:
1.
2.
3.
- manufacturers test
- pump certification test
- acceptance tests
Performance test are conducted on an _______ basis and after _____ repairs
annual
major
Apps undergo exptensive testing to ensure to ____ and the _____train work
pump and drivetrain
Preperformance tests are grouped into 3 catagories:
1.
2.
3.
The purchaser should require these tests when writing specifications for the apparatus _____
- manufacturers test
- Certification tests
- and acceptance tests
Bid
NFPA 1901, 1906 and 414 are commonly used as a basis for most apparatus ____ specifications. Failure to comply ususally results in a ______ by the purchaser
bid
rejection
App manufacturer or certification tests are Normally done by ______(UL)
Underwriters laboratory’s
Acceptance testing of an App is commonly done after delivery of an App but before ______ of the App. D/Os are usually a part of this
acceptance
NFPA 1901 requirements state that a manufacturer needs to do a pump test, road test and a _______ test
hydrostatic test
Road test is a preservice app manueuverability test designed to test _______ worthiness
road
The road test is designed to be conducted at the same _____ it will be in service
weight
The road test must not violate an traffic laws or vehicle codes.
The road service must be ___, ____, ______ and _______
flat, dry, paved and in good condition
The app must accelerate from a standing stop to 35mph in ______ seconds
25
An app must achieve a maximum top speed of _____mph
App must come to a complete stop within 35 feet when traveling ______mph
20
A purchaser should write ________ requirements in the bid specifications. These are expected capabilities
performance
a ________ test is a method that uses water under pressure to check integrity of pressure vessels
hydrostatic test
A hydrostatic tests includes testing under pressure the pump body and the entire ______ and _____ piping system (with the exception of the tank fill and tank to pump lines)
intake and discharge
a hydrostatic test is conducted a a minumum _____psi for _____ minutes
500 psi
10 minutes
Pump certification tests are performed by an independant testing organization such as __________(UL)
Underwriters Laboratories
Pump certification tests are performed at the __________ plant before final acceptance of the vehicle
manufacturers
Results of a pump test are stamped on a plate affixed to the pump ____ on the App
panel
NFPA requires a pump cert test is dont on Apps equipped with a fre pump of ______gpm to ______gpm
750-3000gpm
Any app with a water tank and a tank to pump must have a ____ flow test performed.
Water flow test
Water flow test determines the _____ of flow available for fire fighting
rate
_______ testing is conducted to demonstrate to the purchaser that the apparatus conforms to all bid specifications at the time of delivery
Acceptance testing
Acceptance testing should feature a _____ test in addition to the pump certification test that was previously conducted at the factory
pump
If during an acceptance test the app fails to perform to the requirements outlined in the bid specifications, it should be ____ by the purchaser. Provisions can be made to give the ________ a change to correct deficiencies or supply another App. Or purchaser can consider the order _____ and find another vender
rejected
manufacturer
void
In jurisdictions over ______ feet above sea level should have a pumping engine overload test performed. This ensures the engine develops the necessary ______ to operate at higher altitude
2,000 feet
power
Minimum performance testing includes:
Engine speed
pump shift indicator
Pump engine control interlock
priming system test
vacuum test
pumping test for fire pumps
overload test
pressure control test for fire pumps
intake relief valve system test
Gauge test flowmeter test
tank to pump flow test
Pumper performance testing can be done with a hydrant or static water supply, but a ______ water supply is preferred because it provides easier elevation for pump performance.
Drafting from static water source: pumps rated at 1,500gpm or less should have a maximum distance to the surface of the water to center line pump of _____ feet. 2,000 gpm pumps use a _____ foot maximum lift.
10 feet
6 foot
pumper performance testing should be done at an air temp of ____ to _____ degree F. The water temp should be _____ to ______degrees. Barametric pressure should be at least ____ inches of mercury when corrected to sea level. This is important because a 1 inch drop in barametric pressure will reduce static lift ______ foot
0-110 degrees
35 -90 degrees
29
1 foot
A minimum diameter discharge hose of _____inches must be used for the pump test.
2 1/2 inches
To monitor continued servicability of hose, mark may be scribed where to hose meet the _____. if the scribed mark moves more than ______ of an inch, stop the test and remove the hose.
coupling
3/8 of an inch
Performance tests are conducted at _____psi, _____psi, _____psi and ____psi
150 psi
165psi
200 psi and
250 psi Net Pump Discharge Pressure