Chapter 15 Flashcards
New fire Apps are tested upon completion and for the periodically for its _____ service life
entire
The two categories of testing are grouped as:
_______ and _______
preservice and performance tests
The D/O is usually not involved with the _______ test, however knowledge of the criteria and standards for these tests with aid in understanding performance tests, which the D/O is often involved in.
preservice
Preservice tests include:
1.
2.
3.
- manufacturers test
- pump certification test
- acceptance tests
Performance test are conducted on an _______ basis and after _____ repairs
annual
major
Apps undergo exptensive testing to ensure to ____ and the _____train work
pump and drivetrain
Preperformance tests are grouped into 3 catagories:
1.
2.
3.
The purchaser should require these tests when writing specifications for the apparatus _____
- manufacturers test
- Certification tests
- and acceptance tests
Bid
NFPA 1901, 1906 and 414 are commonly used as a basis for most apparatus ____ specifications. Failure to comply ususally results in a ______ by the purchaser
bid
rejection
App manufacturer or certification tests are Normally done by ______(UL)
Underwriters laboratory’s
Acceptance testing of an App is commonly done after delivery of an App but before ______ of the App. D/Os are usually a part of this
acceptance
NFPA 1901 requirements state that a manufacturer needs to do a pump test, road test and a _______ test
hydrostatic test
Road test is a preservice app manueuverability test designed to test _______ worthiness
road
The road test is designed to be conducted at the same _____ it will be in service
weight
The road test must not violate an traffic laws or vehicle codes.
The road service must be ___, ____, ______ and _______
flat, dry, paved and in good condition
The app must accelerate from a standing stop to 35mph in ______ seconds
25
An app must achieve a maximum top speed of _____mph
App must come to a complete stop within 35 feet when traveling ______mph
20
A purchaser should write ________ requirements in the bid specifications. These are expected capabilities
performance
a ________ test is a method that uses water under pressure to check integrity of pressure vessels
hydrostatic test
A hydrostatic tests includes testing under pressure the pump body and the entire ______ and _____ piping system (with the exception of the tank fill and tank to pump lines)
intake and discharge
a hydrostatic test is conducted a a minumum _____psi for _____ minutes
500 psi
10 minutes
Pump certification tests are performed by an independant testing organization such as __________(UL)
Underwriters Laboratories
Pump certification tests are performed at the __________ plant before final acceptance of the vehicle
manufacturers