chapter 13 Flashcards
Revised drawings must be ______ for future reference
tracked
identified
saved
logged
the design process in which the object parts are sized and then the final assembly is built around the the part that has been designed is called?
Bottom Up
Which of the following is typically not found in the title block?
Primary stock material
Which of the following IS NOT a way of simplifying drawings?
Always draw the top front and right side views
Which of the following is not true regarding patent drawings?
When completing patent drawings completing dimensions is a must
A parts list or __________ is a list that itemizes the parts included in the structure
Bill of material
when estimating a dimension in a drawing what abbreviate is used before the number?
EST
Hidden lines are usually not drawn on assembly drawings
True
Most CAD software will not allow you create a bill of material
False
With the increased used of electric data and digital data storage, including CAD software, the use of paper has greatly been reduced
False
The final drawing checker should concern himself with the soundness of the design, choice of the views, dimensions and clearances for the parts involved
True
In general it is best to use simple number indicators and not make things too complicated
True
In architectural drawings when filling a solid area it is called a?
Poche
use circled numbers called balloon number or ____ _____ to identify the parts in a drawing
Ball tags
Architecural drawings are a type of working drawings or _______ drawings
Construction