Generally, relay pumping and ______operations are the primary method of providing water supply to points remote from water source.
shuttle
Shuttle op relies on the constant movement at the ____ and ______sites
dump and fill
The MOST favorable aspect of a water shuttle op is the ease at which it is _______ when the incident is concluded. often a few portatanks and ______ are the only equipement picked up
terminated.
appliances
A water shuttle may be used first with the intention to transition to _______pumping
relay
Two primary Apps associated with shuttle operations are water _______ and _______
tenders and pumpers
Most shuttle ops require at least ______ apps
two
A pumper located at the water source is reffered to as _______ pumper
fill site pumper
The dump site pumper may operate as the _______pumper. or relay water to the ______pumper
attack
attack
water tenders must be able to have a fill rate of _______gpm so that pumpers assigned to the fill site must be rated at that capacity or greater.
1,000 gpm
Each Dept may choose their tenders based on:
local water supply available
road conditions
Bridge height and weight restrictions.
Vehicle weight restrictions usually restrict single rear axle apps to a max of _______gallons
2,000
For Apps with capacity greater than 2,000 gallons, _____axles, _____axles and _______ trailers are required
tandem rear axles
Tri axles
semi-trailers
Water tenders for only shuttle ops do not require a _____
pump
pumper tenders often have a pump of _______gpm
750 gpm
In order to be considered a tender under NIMS typing, an onboard or portable ________ pump is required.
fire???
There is not need for a seperate tender at the fill site if you are using a _____ tender.
vacuum
A vacuum tender is able to fill at ______ per minute with a lift of _____feet. They can also discharge water at a rate of _______gpm
2,000 gallons
22 feet
1,750
The success of a water shuttle Op depends on it’s ______
efficiency
Faster water Ops are achieved by efficient _______ and ______ ops NOT speeding
filling and dumping
Apps that use medium diameter hose should have at least ____ external fill connections piped directly to the tank.
2
An alternative to heavy LDH filling tenders is the use of ____inch hose with a _____turn connector
3 inch
quarter
Top fill inlets should be placed so that the hose may be connected ______ from the ground
easily
it is prefered to have an “_____” in the fill piping to avoid pressurizing the vehicles onboard water tank.
“air gap”
Filling a tank the the tops of the tank is dangerous and should be _______
discouraged
NFPA 1901 requires that water be capable of being dumped from the _____, ______ and _______. So Apps that have a _______ dump valve often don’t meet the ______gpm flow requirement.
left, right and rear
front
1,000 gpm
In addition to vacuum tenders, there are two primary types of large tank discharges in use on water tenders.
1.
2.
Gravity
jet assisted dumps
Gravity dumps often use an ____inch round or square piping with a valve experior on the app. These discharges may have an _____ mounted to help the flow reach the portatank
8 inches
extension
Gravity discharge valves may be operated near the ______ or remotely from the _______ which increases ff safety.
side or read
cab
Remotely operated valves are operated using ______, ______ or _____
electric
hydraulic
or pneumatic
Jet assisted dumps use a small diameter in-line discharge inserted into the piping of the large tank _______. This uses the ______effect.
discharge
venturi
A jet assisted dump requires the use of engaging the ______ which takes time.
pump
A jet assisted dump can be dumped without the pump but it will be at a much slower rate than a ______ dump
gravity
other cons of a jet assisted dump is the velocity of water that may _____ the portatank and strike people
The mechanism may _____ in cold weather
miss
freeze
A D/O must make sure the vents are completely ____ during fill and dump ops.
open.
Some Apps have remote control vents which are preferable to manually operated vents that require the D/O to ______ on the tank
climb
If App is parked on a grade a significant ammount of water my ____ out the vents
spill
Decision for a successful shuttle op includes:
1. location of _____ and ______ site
2. Route of _____ between fill and dump site
3. number of _____ necessary to maintain a constant supply of water at the scene.
These decisions are best during pre-ncident planning
fill and dump
travel
Apps
The location of a dump site must be close to the __________ but not too close in hampers ops or be exposed to fire or collapse
incident scene
Each Dept should pre-plan ____ sites in the district
fill
Selecting a _____ or _____ site that requires little or no ______ of water tenders is preferred. This will ensure safety and efficiency
Fill or dump
backing
Large scale water shuttle ops might require the use of multiple _____ and ____ sites especially when the incident is spread over a large geographical area.
dump and fill
________ involving movile water supply apps are a mojor cause of death and injury to FFs each year.
The route of tevel for water tenders should be selected on safety and ________ effectiveness
Operational
a ________ route in shape is preferred for travel. This elliminates the need for large tenders to pass each other narrow, rural of _____ limited bridges
circular
weight
Fully loaded tenders should travel _____grade and empty tenders travel _____ grade
down
up
Not always possible, but having roadways _______ to nonemergent vehicles during shuttle ops will lessen congestion.
closed
D/Os must consider the following safety issues when planning a route of travel for water shuttle ops:
1.
2.
3.
4.
5.
6.
7.
- Narrow roads
- Winding roads
- Long driveways
- Blind Curves and intersections
- steep grades
- inclement weather conditions
- Freezing water
When a water supply group is established the person in charge is the Water Supply ______ ________. Only this person will report up the chain of command to the Operations Section Chief or IC. Or contact Operations Chief.
Water Supply Group Supervisor
If the incident escalates beyond the span of control for a group supervisor, the IC may establish a Water Supply Branch under supervision of the Branch ______
Director
It may be beneficial to assign a radio channel to Water Supply _____
Operations
The person assigned to Group Supervisor for water supply operation must have considerable experience in _____, _____ and _____
pumper, water supply and Shuttle Ops
The Water Supply Group Supervisor will assign people to the fill and dump sites. These are usually the ______ or _______
D/O pr company officers