Chapter 11 (SOG for surface incidents) Flashcards
Right of way fence gates are located every _______ft
800
Locks on fence gates can be opened with what key?
Key 2595
The ________ due engine will be accountability on a surface incident
3rd due
We must ensure that all _______ traffic has been stopped and not just metro
Rail
In a situation where the IC cannot see both sides of the train, and operations must be conducted on both sides; the incident may need to be organized into ______ branches. These branches should be named using ______________of reference
2
Geographical points
3rd due engine on a surface or aerial
Accountability
What does the hookman on the 1st due truck bring?
EMS bag
OIC on the 1st due truck brings
WSAD UDC TIC
Driver of the 1st due truck brings
Light bag
Tiller of the 1st due truck brings
Metro bag, hook
Bar on the 1st due truck brings
Forcible entry tools