Sunk Cost

A

A sunk cost is a cost which has already been spent so therefore not included in the cost benefit analysis as if you pick or not pick the project, the cost has already been incurred

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Intangible meaning

A

Intangible items can be difficult to measure the value that gets added or the cost that gets incurred