Chapter 1 UREs Flashcards
- (001) In the “operational events” IMDS subsystem, what phase is the period of time from start to stop of an operational event?
A. 0 (Mission Development)
B. 1 (Mission Recording)
*C. 2 (Mission Accomplishment)
D. 3 (Analysis)
- (001) What IMDS subsystem allows users to document, inquire, and produce records of maintenance actions?
*A. Job data documentation/debrief/maintenance supply
B. Automated test equipment reporting system
C. Status and inventory
D. Operational events
- (001) What section is the advisory agency for all IMDS functional areas in maintenance?
A. Material control
*B. Maintenance data
C. Briefing/debriefing
D. Missile maintenance operations center
- (001) What workcenter uses the IMDS to track in-progress work orders and record the work that has been completed?
*A. MMOC
B. Plans and scheduling section
C. ELAB
D. Resources flight
- (001) What task does the material control section perform in the IMDS that ensures accountability of all ordered parts and aids in resource management?
A. Parts research
B. Job following
*C. Issue/recovery
D. Updating workload requirements
- (001) Which IMDS screen allows workcenter supervisors to create and schedule work orders?
A. Schedule work orders
*B. Scheduled maintenance
C. Master maintenance schedule
D. Work order maintenance schedule
- (002) Which number is used to track nuclear weapons related material (NWRM) under positive inventory control?
A. Part
*B. Serial
C. Model
D. National stock
- (002) How is an item signed out on an AF Form 1297, Temporary Issue Receipt, accounted for during a semi-annual NWRM inventory?
A. Item is considered missing
B. It is considered accounted for
*C. It must be physically verified
D. Inventory account are temporarily adjusted
- (002) What NWRM discrepancy would require elevation to the Air Force Chief of Staff?
A. Improper storage of NWRM
B. Physical loss of an NWRM item
*C. An NWRM item found in Department of Energy control
D. Unaccounted NWRM item found in Department of Defense control
- (003) Maintenance assistance is provided by AFMC in organizational and intermediate level maintenance,
A. technical assistance, and programmed depot level maintenance.
*B. technical assistance, and unprogrammed depot level maintenance.
C. submitting technical order (TO) changes, and technical assistance.
D. submitting TO changes, and unprogrammed depot level maintenance.
- (003) Technical assistance may be provided to the units by AFMC engineers for
A. permanent use of a non-listed equipment item in the TO.
*B. a one-time TO waiver to use a specific part that might have a defect beyond TO limits.
C. an authorization to perform indefinite repairs on equipment beyond what is written in the TO.
D. training pertaining to the installation, operation, and maintenance of equipment using systems knowledge.
- (003) What specific depot level assistance request is used for situations where standard procedures may need to be deviated from?
*A. Technical
B. Depot level
C. Maintenance
D. Technical engineering
- (004) What test checks most functions that wold prevent a launch prior to SELM test posturing?
*A. Alert readiness test
B. Last-look inspection
C. Quick-look inspection
D. Terminal countdown test
- (004) What task would be performed during SELM posturing?
A. Replacing targeting codes with new codes
B. Installation of the guidance and control test set
*C. Removing the re-entry system if ordnances will be fired
D. Isolating the test launch control center rom the test launch facility
- (004) Once all SELM posturing tasks are complete, QA personnel must again verify proper configuration prior to
*A. starting up the missile guidance set.
B. completing the alert readiness test.
C. installing test codes in the missile.
D. isolating the test launch facility.