Chapter 1 Flashcards

1
Q

Types of construction drawings

A
  • Architectural drawing
  • Civil and Structural drawing (consists of: drains, roads, culverts)
  • Mechanical and Electrical drawing (consists of: air conditioning, water and gas piping)
  • Topography / survey plan (consists of: height of ground level of the proposed building and its surrounding)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Purpose of setting out

A

Setting out is required to mark out the proposed area for construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Personnel involved in construction

A
  • Consultant
  • Contractor
  • Sub-contractor
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Types of construction activities

A
  • Architectural work
  • External works (drain, culvert, driveway)
  • Superstructure construction
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Types of preliminary work

A
  • Access to site
  • Traffic routes for equipment
  • Storage of materials
  • Location of site office
  • Sheds for bar bending and formwork fabrication
  • Fencing and hoardings
How well did you know this?
1
Not at all
2
3
4
5
Perfectly