Chapter 1 Flashcards
1
Q
Types of construction drawings
A
- Architectural drawing
- Civil and Structural drawing (consists of: drains, roads, culverts)
- Mechanical and Electrical drawing (consists of: air conditioning, water and gas piping)
- Topography / survey plan (consists of: height of ground level of the proposed building and its surrounding)
2
Q
Purpose of setting out
A
Setting out is required to mark out the proposed area for construction
3
Q
Personnel involved in construction
A
- Consultant
- Contractor
- Sub-contractor
4
Q
Types of construction activities
A
- Architectural work
- External works (drain, culvert, driveway)
- Superstructure construction
5
Q
Types of preliminary work
A
- Access to site
- Traffic routes for equipment
- Storage of materials
- Location of site office
- Sheds for bar bending and formwork fabrication
- Fencing and hoardings