CHANDRAYAAN Flashcards
What is the launch vehicle of CHANDRAYAAN 3
LVM-3
FULL FORM LVM-3
LAUNCH VEHICLE MARK-3
Previous name of LVM-3
GSLV Mk-3
geosynchronous satellite launch vehicle
From where is it being launched..
ISRO
Satish Dhawan Space station (SRIHARIKOTA)
Where is satish dhawan space station?
Andhra Pradesh
Time of launching and landing
LAUNCH=14th JULY(2.35PM)
LAND=23rd AUGUST
Measures of LVM 3
Height=43.5m
Weight=640 tonnes
How many successful mission ha LVM 3 introduced?
6
include chandrayan 2=(LVM 3 M1)
LVM 3 used for chandrayaan 2
LVM 3 M4
About LVM-3 structure module
*3 stage configuration vehicle
*2 strap on motors(S200)
*one core liquid stage (L110)
*C25 cryogenic engine=CE20
LVM project director
Mohan Kumar
Budget of chandrayan 3
615 milliom
PROPULSION MODULE payload
SHAPE
Spectro polarimetry habitable for planet earth
orbit elliptical
170*36,500km
parts
PRAGYAN ROVER
VIKRAM LANDER
NO ORBITER UNLIKE CHANDRAYAN 2
India’s next moon mission with JAPAN named?
LUPEX
JAPAN’s new moon mission
SLIM
Smart lander for investigating moon
TIME-2024-25
sapce agency=JAXA
Phases of chandrayaan 3
HOW MANY INSTRUMENTS ON LANDER AND ROVER?
1- ROUGH BREAKING
2-ALTITUDE HOLD PHASE
3-FINE BRAKING PHASE
4-TERMINAL DESCENT PHASE
LANDER=4
ROVER=2
Description of rover
VELOCITY
*26 kg
*6-wheeled
*has 2 instruments
*will be there for 14 days
LESS THAN 2m/sec
Chandrayaan 3 reached in how much time?
6 weeks
LUNA 5 TIME=1 WEEK
CHINA’S CHANGE 5=1 WEEK(2020)
US APOLLO 11 MISSI