Ch. 7 QTO Flashcards

1
Q

How to calculate backfill?

A

Subtract volume of concrete from excavation volume then multiply by swell factor to determine volume in loose CY.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

excavation backfill (LCY) equation

A

Excavation (BCY) - concrete volume (cy) x swell factor (1.35)/compaction factor (.95)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

excavation disposal (lcy) equation

A

Excavation (bcy) x swell factor (1.35) - backfill (lcy)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How to quantify structural steel?

A

Number of pieces for install labor, and weight for OM estimate. include rolled steel. Include additional 15% for connections

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Quantify bolts?

A

Bolts are quantified by number for labor productivity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Quantify joist?

A

By length for each type. material and labor may be determined by linear foot.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Quantify decking?

A

By square feet. include additional 10% for lapping.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Quantify stairs?

A

By number of flights, number of landings or length.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Quantify dimensional lumber?

A

by linear foot for listed type then converted to board feet. (BF = (W” x Thick” x length’) / 12”/foot))

How well did you know this?
1
Not at all
2
3
4
5
Perfectly