Ch:1 Construction Industry Flashcards
Heavy construction
Larger infrastructure like highways, bridges, canals, dams, subways, tunnels, utility systems, water control, communications
Industrial
Large-scale manufacturing, processing, and chemical plants or utility generation installations.
Design intent
Statement that defines the anticipated aesthetic, functional, and performance characteristics of the finished building
Floor plan
Representation of a building viewed from above after a horizontal plane has been cut through it and the top portion removed.
Building section
View of a building after a vertical plane has been cut through it and the front portion removed.
Construction documents
Composed of the drawings and specifications
Construction drawings
Working drawings showing dimensional relationships of form, size, and quantities
Specifications
Detailed information on exact materials to be used and the ways processes are to be conducted
General contractor GE
Assume responsibility for entire construction at a specific cost and by specified date
Subcontractors
Perform the required work within their technical areas like electrical, plumbing etc.
Superintendent
General contractor’s on site representative responsible for continuous field supervision.
Competitive bidding
Qualified construction contractors are invited to bid on the project on a competitive basis. Contract is often awarded to lowest bid
Invitational bidding
Only preselected contractors are asked to provide bids on a project
Negotiated contract
Owner may decide on a contractor from previous projects without seeking other bids
Fast tracking
Shortens construction time by beginning work on site prior to completion of construction documents
Construction manager
Provide input during the design phase and oversight and administration of the bidding and construction phases
Building permit
Authorizing certificate for construction after construction documents are reviewed for compliance of code
Authority having jurisdiction (AHJ)
Local governing authority for permits
Shop drawings
Precise directives for the fabrication of certain components. Explains fabrication and installation procedures
Mock-up
Full sized model of proposed construction system
RFI
Request for information
Construction change directive
Change order describes change along with additional drawings and specifications when necessary
Punch list
After major portions are completed, final detail items are made for a “punch list”
Certificate of occupancy (C of O)
Issued by local building department that building complies with local code and is in condition for occupation.
OSHA
Occupation Safety and Heath Act
Integrated design phase (IDP)
Attempts to bring together all participants at the design phase
Building information Modeling (BIM)
3D modeling software with other project information
Building construction
Erection of a building on a piece of property. Includes residential, commercial, civic, educational, religious, and agricultural.