CGTO PG-85-00-110-A Flashcards
Who selects and designates QA inspectors in writing?
Engineering Officer
PG 1-1
When can a collateral QA sign off grounding discrepancies and flight control work?
When approved by a supervisor with maintenance release authority.
PG 1-1
What manual are you able to find aviation hydraulics and hydraulic fluid surveillance?
NAVAIR 01-1A-17
PG 1-2
What is the decisive factor of the JOAP programs success?
Attitude of an operating activity
PG 1-2
Who provides funds directly to DoD for U.S. participation in JOAP?
CG-41
PG 1-3
What manual do refer to for JOAP sample taking and documentation?
NAVAIR 17-15-50
PG 1-3
What is included for SCHR entry of engine components being monitored by JOAP?
Location of the lab and inclusive dates
PG 1-3
What must be included in the SCHR for removed components due to JOAP?
State the reason and include the contaminants in PPM of the last sample
PG 1-3
Where are questions regarding oil and debris analysis sent to for Turbomeca 2C2CG?
U.S. Coast Guard Contracting Officers representative at Turbomeca USA ATTN: Coast Guard
PG 1-4
Where are questions referred to for tail gearbox and main gearbox JOAP?
ALC SRR Product line engineering cell
PG 1-4
Reliability Centered Maintenance process guide?
CGTO PG 85-00-30-A
PG 1-4
Aircraft fueling manual?
CGTO PG-85-00-170-A
PG 1-4
When are fuel sample storage not required?
When not operating from a routine location, such as ferry flights
PG 1-5
The normal level of fuel system icing inhibitor in turbine fuel FSII?
0.07-0.15 percent by volume
PG 1-5
Introduction of FSII will lower the flash point of JP-5 by how much?
4 degrees Fahrenheit
PG 1-5
The use of mobile dehumidifier carts for how long will reduce avionics dispatch failure rates by how much?
8 hours, 40%
PG 1-6
Corrosion process guide?
CGTO PG-85-00-60-A
PG 1-5
TMDE Shall?
May be extended, but shall not be extended
PG 1-7
Who manages the Aviation tempest program?
ALC as directed by the Commandant, CG-41
PG 1-9
Coast Guard TEMPEST program manual?
COMDTINST M2241.6
PG 1-10
How long will a maintenance instruction be filed?
6 months after completion date
PG 1-10
Who prepares a maintenance instruction?
QA
PG 1-10
Who signs a maintenance instruction?
EO subsequently after QA prepares it
PG 1-10
What maintenance instruction does not direct the accomplishment of specific work at definite intervals, but which is sustaining in nature?
Technical Information Maintenance Instruction (TIMI)
PG 1-10