CFM GUIDANCE Flashcards
MAXIMUM DEMONSTRATED CROSSWIND – CONTAMINATED RUNWAY takeoff/landing
TAKEOFF = 15 KNOTS*
LANDING = 15 KNOTS*
*Exceptions may be approved by a Chief Pilot, Director of Operations,
or designee after a risk assessment.
The PIC will plan the departure fuel load to land with a minimum of __________ lbs of fuel
remaining at destination.
700
Company minimum field lengths required for landing?
Level 1 -4200x75
Level 2 -3500 x60
Level 3 -DO or CP approval
For a Level 1 runway length/width what conditions must be met?
4200x75
The PIC may operate to the minimum length and width indicated under all conditions.
For a Level 2 runway length/width what conditions must be met?
3500x60
The PIC may reduce the runway length and width to the minimum indicated in this
level as long as all of the following additional conditions are met at the airfield:
Day (sunrise to sunset)
Dry runway
VMC (1,000/3, unless higher minimums are listed in individual airport
restrictions)
Crosswind component of 15 knots or less
Wind gust factor (recorded gust minus steady-state wind) not more than 10
knots
No recent reports (<15 min) of low-level wind shear at the field
For 91 operations, the aircraft must be able to land within 80% of the effective
landing distance available.
MAXIMUM CROSSWIND COMPONENT – DRY RUNWAY
TAKEOFF = 25 KNOTS*
LANDING = 28 KNOTS*
*DO or CP deviations allowed
Contaminated Runway Tailwind Operations
Crewmembers will not land on a contaminated runway with more than?
5 knots of tailwind