Certification Flashcards

1
Q

What are the options at the point of registration?

A
  1. Register for single-certification.

2. Register and activate a three-year or five-year subscription

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the timeframe for WELL V2 and WELL v2 pilot projects to undertake performance measurements?

A

Within 5 years of the date of registration, or while their subscription is active, whichever is longer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the timeframe for WELL v1 and WELL V1 pilots to undertake performance measurements?

A

Within 5 years of the date of registration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When do projects define the boundaries of a project scope?

A

Registration

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How to projects calculate their size for WELL?

A

The gross square footage includes the sum of the floor areas of the spaces within the building, including, as applicable, basements, mezzanine and intermediate-floored tiers, and penthouses with headroom height of 7.5 ft. or greater.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who makes up the project team?

A

Project Administrator, Owner, Additional Signatories (architects, contractors, and MEP engineers, or owner’s representative), WELL Accredited Professional (WELL AP, not mandatory), WELL Coaching Contacts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the required document types for certification?

A

Annotated documents, letters of assurance (LOAs), general documents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the types of annotated documents?

A

Design documents
Construction documents
Operations schedules with time log templates
Policy documents
Signage and communication materials
Professional narratives
Other materials including surveys and balancing reports

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

From whom will letters of assurance by required to confirm features have been met?

A

Architects
Contractors
MEP Engineers
Owner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What general documents are required?

A

Signed WELL Certification Agreement
A project checklist
Representative floor plans or project maps
Mechanical drawings
Narrative describing the project in general and listing the attempted features
Proof of construction completion. This may be through a certificate of occupancy or other documentation that similarly confirms that construction is complete.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the two stages of documentation that projects may use during the certification process?

A

Intent-stage documents (for use in WELL V2 projects’ optional WELL Precertification early stage review)
Implementation-stage documents (for use in either Precertification or Documentation review

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How is WELL precertification achieved for WELL v1 projects?

A

An optional review pathway available to all project types for a fee. It is focused on the intended design, construction, and operational strategies for the project. Projects pursuing precertification submit a short narrative for each targeted feature briefly describing how the project intends to meet features’ requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How is WELL v2 precertification achieved?

A

Projects registered may opt for an early phase of review to receive the WELL Precertification designation.

Precertification occurs prior to Documentation Review and Performance Verification. Projects may submit feature-specific documentation reflecting operational commitments and design intents or implemented conditions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What environmental parameters do performance tests span?

A
Air quality
Water quality
Light attributes
Thermal considerations
Acoustic elements
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Third-party laboratories do the performance tests for the following:

A

Radon
Formaldehyde
VOCs
up to 32 different water contaminants

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How many calendar days does the project team have to either accept their WELL report or initiate curative actions or an appeal?

A

180

17
Q

These are used when projects wish to deploy alternative strategies to meet the intent of an existing WELL feature.

A

Alternative adherence paths (AAP)

18
Q

These are used when projects wish to receive credit in WELL for pursuing intents and strategies that do not have a precedent in an existing WELL feature.

A

Innovative features

19
Q

How many free AAPs can WELL v1 and WELL v2 projects have?

A

3

20
Q

How many free AAPs can WELL v1 pilots, WELL v2 pilots, and all WELL subscribers have?

A

10

21
Q

How many innovations may WELL v1 and WELL v1 pilots submit?

A

up to 5

22
Q

How many innovations may WELL v2 and WELL v2 pilots submit?

A

up to 10

23
Q

How long is certification valid?

A

three years

24
Q

(T/F) Projects must submit data annually to maintain their certification status.

A

True