Contract Sum
As stated in the Owner-Contractor Agreement, this is the total amount payable by the owner to the contractor. It is the payment for the performance of the work done under the requirements of the contract documents.
What are the owner’s obligations to the contractor?
- Furnish evidence of the necessary funds to complete the project
- Pay for necessary approvals, assessments, etc. (except permits and fees)
- Provide legal descriptions and site surveys including utility locations and easements
- Provide copies of the necessary drawings for the execution of the construction
According to the AIA Document A2.01-2007, and architect’s periodic site visits during construction are considered:
A. supervisions
B inspections
C. observations
D. examinations
(C) observations
Other than the two required inspections of a project, the architect’s site visits are an observation of the project. The architect may visit the site several times in an effort to become familiar with the process. This allows the architect to keep the owner informed of progress, protect the owner against any deficiencies, and see that the construction is in accordance with the contract documents
Construction cost included all of the following except:
A. Labor
B. Contingencies
C. Surveys
D. Contractor Fees
(C) surveys
Construction costs excludes the fees for professional services, for example, architect fees and surveys, as well as other budget items that are the responsibility of the owner such as land costs and financing.
In a typical project manual, what compromises the contract forms?
- The Owner- Contractor Agreement
- The Performance Bond
- A Payment Bond
- A Certificate of Insurance
According to the AIA General Conditions, what are the architect’s responsibilities regarding shop drawings?
They are responsible for the timely review and approval of shop drawings. Their approval verifies the shop drawing’s conformance with the design intent of the contract documents. Their review is not intended to determine the accuracy of dimensions, quantities, or completeness of information and does not constitute approval of any safety precautions or construction methods.
They may request that the contractor revise and resubmit shop drawings. Records of these and other submittals should be maintained to avoid possible claims.
During the bid phase, a bidder finds two different details for the same connection. What is the correct course of action?
A. Provide a bid price for the less expensive detail
B. Provide a contingency allowance
C. Notify the architect
D. Increase the bid to cover both options
(C) notify the architect
The discrepancy should be brought to the attention of the architect in writing. The architect should interpret the conflict and determine which detail is appropriate. Then the architect should issue an addendum to all bidders for clarification. This will allow contractors to bid more accurately.
During a site visit an architect observes an unsafe condition in the execution of construction. What course of action should the architect take?
The architect should notify the contractor of the condition immediately and, if necessary, follow up by including the observation in a field report. It is the contractor’s responsibility to maintain site safety. Therefore, the architect should not make corrective suggestions or recommendations regarding construction means and techniques. In the event of an accident these recommendations could result in the architect’s exposure to liability.
With regard to the owner, what is the architect’s role in the bidding process?
During the construction documents phase, the architect is required to assist the owner in the preparation of the bidding documents and requirements. Other obligations of the architect include assisting the owner in:
- Compiling a list of prospective bidders or contractors
- Obtaining competitive bids or negotiated proposals
- Preparing a awarding contracts for construction
- Evaluation of the successful bid proposal
Labor often compromises what percentage of the construction cost?
A. 10%
B. 25%
C. 50%
D. 75%
(C) 50%
Labor costs account for a substantial portion of the construction cost, often as much as 50% or more. Therefore, the architect should endeavor to minimize the amount of on-site labor. The use of repetitive elements or prefabricated components are two methods used to speed construction and reduce labor costs.
Define Fast Track
A type of delivery scheduling that attempts to decrease the total project time by overlapping the design and construction phases. In these projects contracts are awarded to different contractors in stages, as the design is completed.
For example, work on the foundation can begin while the architect completes the design details for mechanical systems.
Define Master Format
The standard outline of construction materials and components developed by the Construction Specifications Institute (CSI). The format, including the 16 primary divisions, were revised in 2004 and forms the basics by which the building trades organize information.
For example, information regarding door hardware or window frames can be found in division 08, Openings.
A list of subcontractors and a list of material substitutions will typically be found in which part of the construction documents?
These supplements to the bid forms will be found in the bidding requirements portion of the project manual.
What are the characteristics of mechanical, electrical, and plumbing drawings?
The drawings and schedules prepared by these consultants contain information regarding the systems themselves, such as equipment dimensions and the sizes of the ducts or pipes. They are diagrammatic as a rule and do not contain complete dimensional information relating the systems to the physical conditions. The exact location of many of these components may be determined in the field by the contractor. Therefore it is imperative that the architect coordinate the work of the consultants with the architectural working drawings.
Arbitration
Widely used in the construction industry, it is a method of dispute resolution between project participants that does not involve litigation. In this process, claims from both parties are submitted to a mutually acceptable arbitrator. These proceedings are conducted under the rules of the American Arbitration Association. The award is final and binding and may be enforced by the courts. It is usually quicker and less expensive than litigation. It is private and does not become part of the public record.
Gradient Ratio
A term used to describe a slope. Although the formula for percentage of slope is solved using d/L (rise over run), this term is usually expressed as a ratio between the horizontal distance (run) and the vertical rise (or fall) of a grade. For example, 5:1 designates five feet of run to a one foot change in vertical height. 5:1 or 1/5 = .20 or 20%
Multiple Prime Contract
This is an approach where an owner contracts separately with more than one contractor for the major portions of a job, such as the mechanical or plumbing work. This can be difficult to coordinate and may require the services of a construction manager.
The most common form of owner contractor agreement is the Single Prime Contract where one contractor is responsible to the owner for the entire project.
Fixed Fee
A method of compensation for professional or construction services based on a lump-sum amount for a particular scope of service. Convenient when services can be accurately defined. A contingency should be included to cover the risk that costs may exceed the budget on which the fee is based.
Also called a Stipulated Sum Agreement (see AIA Document A101-2007). Reimbursable services such as postage and reproductions are usually in addition to the contract sum. This method of compensation is more common than cost plus fee.
Application for Payment
These itemized requests for payment are made by the contractor and submitted to the architect at specific intervals during a project. These periodic payments by the owner are called progress payments and are for the completed portion of the work including materials and equipment stored on and off site if approved by the owner. They are to be submitted at least 10 days prior to the date established by the schedule of values.
Prior to payment the architect reviews the contractor’s request, and if approved, issues a certificate for payment to the owner.
When is the use of mock-ups appropriate?
This is the process of modeling an object or building component, to scale or full size, for the purpose of studying or clarifying construction details, aesthetics, scale, or testing performance. It is useful when an innovative detail is specified and the additional time and cost of preparing the model outweighs the potential cost of unforeseen problems.
Methods of settling conflicts between the contracted parties in a construction project other than litigation are commonly referred to as:
A. AAA
B. CMR
C. MMP
D. ADR
ADR, Litigation is costly, time consuming, and part of the public record. As a result, the construction industry has developed Alternative Dispute Resolution. These methods allow for the resolution of disputes without legal intervention. If methods such as direct negotiation and architect as arbitrator have failed, the two basic means of ADR are:
Mediation: A mediator empowers the participants to resolve the dispute themselves yet has no power to force a resolution
Arbitration: A mutually acceptable arbitrator, knowledgeable in the construction industry, will hear arguments, evidence, etc. prior to rendering a legally binding decision.
Since each successive step in dispute resolution represents an increase in the necessary investment of time and money, it is important to prevent disputes. After disputes occur, they should be resolved at the lowest level. As a last resort, binding adjudication should be employed.
How much time does an architect have to process shop drawings submitted by the contractor?
With regard to submittals, the architect is expected to; review and approve, or take other action with “reasonable promptness,” according to the AIA General Conditions. This allows sufficient time for architectural review without causing a delay in the progress of the project. The exact amount of time is not specified but 10 working days is common. (see AIA Document A201-2007)
The statement issued by the contractor, that describes the portions of the Contract Sum that are allocated to the various parts of the project, is called a:
A. Critical Path Allotment
B. Certificate of Itemization
C. Task Breakdown
D. Schedule of Values
Schedule of Values: This schedule, furnished to the architect prior to the first application for payment, is issued as the basis by which the architect reviews the contractor’s application, approves progress payments, and issues certificates for payment to the owner.
Closed Specifications
Also called Prescriptive, Base Bid, or Proprietary Specifications, where specific products or processes are stipulated without provision for substitution.