1
Q

What determines an Account’s Balance?

a) the sum of all the Financial Transactions linked directly to the service agreements related to the account
b) the amount recorded in the ‘‘Balance Due’’ field on an account
c) the logic defined in a plug-in spot on the Installations Option
d) the sum of all the balances recorded in the ‘‘Balance Due’’ field on each service agreement related to the account
e) the sum of all the Financial Transactions linked directly to the account

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Which statement is true about specifications?

a) Specifications include the inspection history of an asset.
b) Specifications apply only to assets and not to components.
c) Specifications can include peer specifications.
d) A single specification can only be used on one asset.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

At what stage in the initial measurement data (IMD) import process will the application of meter multipliers be performed?

a) Critical Validation
b) VEE
c) Prepare for VEE
d) post-VEE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

A Service Order Orchestrator determines the steps required to complete the service. As an example, based on the state of the service point, what does the Enable Service Orchestrator determine the actions for?

a) Create a Device Configuration; Install a Device; Turn on the Device
b) Connect the Service Point; Install a Device; Create a Usage Subscription
c) Create a Service Point; Install a Device; Turn on the Device
d) Connect the Service Point; Install a Device; Turn on the Device

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which option correctly describes the high-level process from loading measurements through calculating usage?

a) Load Initial Measurements / 2. Validate, edit, and estimate Initial Measurements / 3. Create Final Measurements / 4. Update Initial Measurements
b) Load Initial Measurements / 2. Verify, evaluate, and enter Initial Measurements / 3. Create Final Measurements / 4. Calculate Usage
c) Load Initial Measurements / 2. Validate, evaluate, and estimate Initial Measurements / 3. Update Initial Measurements / 4. Calculate Usage
d) Load Initial Measurements / 2. Validate, edit, and estimate Initial Measurements / 3. Create Final Measurements / 4. Calculate Usage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

How many bill segment-related financial transactions do Payment Arrangements have?

a) depends on the number of bills that will contain the customer’s payment arrangement details
b) one
c) depends on the number of payments that are part of the payment arrangement
d) unlimited
e) none

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Your implementation requires an installation of two types of devices: Electric Smart Meter & Gas Manual Meter.

Which two Device Type attributes are required to identify these device types? (Choose two.)

a) Device Business Object
b) Service Type
c) Valid Measuring Component Types
d) Manufacturer
e) Serial Number

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

A device has one or more measuring components that measure consumption, demand, or other values.

Which lists two attributes of a measuring component?

a) Channel Multiplier and Channel ID
b) Channel ID and Badge Number
c) Serial Number and Badge Number
d) Model and Serial Number
e) Manufacturer and Model

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which three statements are true in relation to a Payment Arrangement Request? (Choose three.)

a) examines the Account’s eligibility for Payment Arrangement
b) ensures creation of either Pay Plan or Payment Arrangement
c) creates the Payment Arrangement Service Agreement
d) calculates delinquent amount for Service Agreements eligible for Payment Arrangement
e) determines if the Payment Arrangement Request requires approval

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which relationship must be established with an external system or a service provider before creating bill determinants?

a) Usage Transaction
b) Usage Rule
c) Usage Subscription
d) Usage Factor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Your customer’s initial measurement data (IMD) has been imported and can be viewed through the Measuring Component portal, but is not in the ‘‘Final’’ measurement status.

What can you assume that the IMD has passed?

a) Critical Validation
b) Multiplier Check Validation
c) Sum Check Validation
d) Critical Validation, High/Low Check Validation, and Sum Check Validation
e) High/Low Check Validation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Your client has three requirements:
1. Apply validations on meter reads coming from the Data Collectors.
2. If a meter read does not pass the validation, an error will be generated and assigned to a user.
3. Retry the validation every 30 minutes for the errors in case the issue is related to configuration.

Which statement describes the base functions you should use?

a) If a To Do entry is created on the VEE exception, the IMD’s Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-COMP-TD (Complete To Do Entries).

b) If a To Do entry is created on the VEE exception, the IMD’s Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-IMD-RETRY (Retry Initial Measurement Data Processing)

c) If a To Do entry is created on the VEE exception, the user will need to discard the IMD and a new IMD will be loaded after 30 minutes.

d) If a To Do entry is created on the VEE exception, the IMD’s Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-CRE-IMDTD (Create To Do)

e) If a To Do entry is created on the VEE exception, the user will need to discard the IMD and a new IMD will be manually loaded.

A

If a To Do entry is created on the VEE exception, the IMD’s Next Retry Date/Time is set to 30 minutes, and then processed by the algorithm D1-IMD-RETRY (Retry Initial Measurement Data Processing)

(Review the Algorithm in C2M for examples)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which three are important Account concepts that must always be followed? (Choose three.)

a) Accounts expire when there are no active contracts.
b) An Account can only reference one and only one person at one time.
c) Every Account has a unique, system-assigned Account ID.
d) Bills are produced for an account and are sent to the account persons.
e) An Account references one or more persons.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Which three initial measurement data (IMD) exception categories are available when you execute VEE rules? (Choose three.)

a) Issue
b) Terminate
c) Low
d) Information
e) Complete

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

When creating a new business object for a service point (SP), what items are required to be able to view and update the new elements associated with the SP?

a) Maintenance Object, Application Service, and Schema
b) Schema, Validation Algorithm, and Maintenance UI Map
c) Display UI Map, Display Map Service Script, and Maintenance UI Map
d) Validation Algorithm, Post Processing Algorithm, and Lifecycle

A

Need Verification

Display UI Map, Display Map Service Script, and Maintenance UI Map

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Which business object performs critical validations whenever initial measurements are loaded?

a) D1-IMDRetry
b) D1-GenericIMDMain
c) D1-IMDSeeder
d) D1-IMDPreVEE
e) D1-IMDPeriod

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

When a customer has a specific price for a defined quantity which is different to other customers, where is this specific price for the related Bill Factor defined?

a) Bill Factor Characteristic
b) Bill Factor Value
c) Service Agreement - Contract Value
d) Calculation Rule
e) Account Characteristic

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

In addition to sets of procedures, and careful handling instructions for hazardous or delicate materials, what can Specifications include to provide information about assets or other entities?

a) Attributes
b) Specifications
c) Rules
d) Conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What correctly describes the order in which algorithms, if plugged in, are executed when a bill changes from the ‘‘Pending’’ state to the ‘‘Complete’’ state?

a) Service Agreement Type - Pre-Bill Completion; Service Agreement Type - Bill Completion; Customer Class - Pre-Bill Completion; Customer Class - Bill Completion; Customer Class - Post-Bill Completion

b) Customer Class - Pre-Bill Completion; Customer Class - Bill Completion; Service Agreement Type - Pre- Bill Completion; Service Agreement Type - Post-Bill Completion

c) Customer Class - Pre-Bill Completion; Service Agreement Type - Pre-Bill Completion; Customer Class - Bill Completion; Service Agreement Type - Bill Completion; Customer Class - Post-Bill Completion

d) Service Agreement Type - Pre-Bill Completion; Customer Class - Pre-Bill Completion; Service Agreement Type - Bill Completion; Customer Class - Bill Completion; Customer Class - Post-Bill Completion

e) Service Agreement Type - Pre-Bill Completion; Customer Class - Pre-Bill Completion; Service Agreement Type - Bill Completion; Customer Class - Bill Completion; Service Agreement Type - Post-Bill Completion; Customer Class - Post-Bill Completion

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

How many Tenders can a Payment Event have?

a) one Tender per Payment Event
b) one Tender for each account the payment is applied to
c) one Tender for each form of Payment submitted
d) no Tenders for Payment Events, only Payment Segments
e) no Tenders for Payment Events, only Payments

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Which three statements are correct for Adjustment Types? (Choose three.)

a) They can default an Adjustment Amount to adjustments.
b) They control how adjustments appear on bills.
c) They control whether a rate is to be called to calculate an adjustment amount.
d) They control the valid Service Agreement Types that adjustments can be linked to.
e) They control the valid Adjustment Profiles that adjustment types can belong to.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Which two are ‘‘Are SP and Device Ready?’’ state algorithms for Enable Service? (Choose two.)

a) Customer Device Compatibility Check
b) Create Service Point
c) Check for Measurement
d) Create Usage Subscription
e) Start Service Agreement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

How should you configure the derived values that are relevant for a device?

a) Configure the derived values on the Measuring Component for the measuring components to be defined on the device.
b) Configure the derived values on the Measuring Component Type for the measuring components to be defined on the device.
c) Configure the derived values on the Device Type for the derived values to be defined on the device.
d) Configure the derived values on the Final Measurement Type for the measuring components to be defined on the device.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Usage transactions can contain date breaks. Which is used to supply date breaks?

a) the Deferred Monitor Calculation Algorithm
b) the Usage Subscription Type
c) the requesting system or user input
d) the Usage Subscription BO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

Which three statements are true about initial measurements, final measurements, and usage? (Choose three.)

a) Usage is a synonym for bill determinants.
b) The initial measurement data can be optionally stored in Raw format.
c) A service point can have more than one initial measurement for the same period, but only one final measurement.
d) Final measurements can be directly edited or updated by users or by automated processes as required.
e) Usage is loaded in the application to generate final measurements.

A

The initial measurement data can be optionally stored in Raw format

Final measurements can be directly edited or updated by users or by automated processes as required.

This answer is speculative, needs more concrete data
c) A service point can have more than one initial measurement for the same period, but only one final measurement.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

What correctly describes the possible causes of price proration?

a) change in Bill Factor only
b) changes in Rate Schedule and Bill Factor only
c) change in Rate Schedule only
d) change in Rate Version Calculation Group only
e) changes in Rate Version Calculation Group and Bill Factor only

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

When a service agreement is created, it is based on a template called the Service Agreement Type (SA Type) and values may be defaulted from a Start Option.

Which three attributes can get defaulted from a Start Option? (Choose three.)

a) Terms and Conditions
b) Service to be billed
c) Contract Quantities
d) CIS Division
e) Rate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

What can cause multiple bill lines for a rate component to be produced in a bill calculation header?

a) changes in Rate Schedule and Bill Factor
b) changes in Rate Version Calculation Group and Bill Factor
c) change in Bill Factor
d) change in Rate Version Calculation Group
e) change in Rate Schedule

29
Q

Which three statements are true about the different types of measuring components? (Choose three.)

a) Seconds-per-interval (SPI) is one of the attributes of scalar measuring components.
b) Only physical measuring components reference a device configuration.
c) The terms register and channel are synonyms for measuring component.
d) The measuring component types are physical, standalone, scratchpad, and TOU.
e) Scalar measuring components contain a single measurement for an arbitrary period of time.

30
Q

What contains the details of how a bill was calculated and how it will be printed on a bill?

a) Calculation Rules
b) Rate Schedule
c) Service Agreement
d) Bill Segments
e) Bill

A
31
Q

How many devices can be installed at a service point at an instance in time?

a) exactly one device
b) up to three devices
c) one for each service type
d) one for each measuring component

32
Q

A usage subscription must exist before usage transactions can be calculated for a specific service point.

Where do you configure the usage recipient?

a) in the Usage Rule Type
b) in the Service Point Type
c) in the Device Type
d) in the Measuring Component Type
e) in the Usage Subscription Type

33
Q

Measuring components are either subtractive or consumptive.

Which statement correctly describes these two concepts?

a) Subtractive measuring components are associated only with water service, whereas consumptive measuring components are for gas and electric services.

b) Subtractive measuring components are used to measure demand, whereas consumptive measuring components are used to measure how much was consumed since the previous reading.

c) Subtractive measuring components are associated with deductive meters, whereas consumptive measuring components are not.

d) A subtractive measuring component’s consumption for a given period of time is the end measurement minus the start measurement. A consumptive measuring component’s consumption is simply the measurement itself, and represents the consumption for the period of time since the previous measurement was taken.

34
Q

Approval Profiles control which aspects of an Adjustment?

a) whether current and/or payoff balance are affected by the adjustment
b) control how adjustments are approved
c) if an adjustment requires approval before it’s frozen
d) information defaulted on an Adjustment
e) whether the adjustment should appear on the customer’s next bill

35
Q

Which two statements about usage subscription types are correct? (Choose two.)

a) Usage subscription types define the main billing contact.
b) Usage subscription types define the time zone.
c) Usage subscription types define the valid service point types.
d) Usage subscription types define the recipient of the usage.

36
Q

**How many derived values can a final measurement have in addition to the primary measured value? **

a) 2
b) 15
c) 10
d) 5

A
37
Q

**Which usage rule would be used to retrieve scalar measurements and convert the total from one unit of measure to another? **

a) Get Scalar Details and Math
b) Get Scalar Details and Apply Formula
c) A custom set of usage rules must be written.
d) Get Scalar Details and Axis Conversion

38
Q

What can cause a bill segment to have multiple bill calculation headers?

a) multiple Rate Version Calculation Group
b) multiple Scheduled Read Dates covered by the bill period
c) proration at Bill Factor level
d) multiple service agreements being covered by a bill segment
e) proration at Calculation Rules level

39
Q

When you cancel a payment, what will the system automatically do?

a) generate a new Financial Transaction to reverse the original Financial Transaction
b) cancel all tenders associated with the payment
c) impact the credit rating
d) charge a NSF Fee for the payment cancellation

40
Q

When the source of a Financial Transaction is canceled, what does it result in?

a) The source Financial Transaction is deleted and a new reversal Financial Transaction is created.
b) A new reversal Financial Transaction is created.
c) The source Financial Transaction status is changed to ‘‘Canceled’’.
d) The source Financial Transaction is deleted.
e) No change occurs.

41
Q

An electric utility is starting an Advanced Meter Infrastructure (AMI) roll-out for their residential customers. The initial plan is to roll out devices from their manufacturer with potentially three different device models. The customer has not decided what head-end systems they will use to communicate with these devices. Based on the customer’s initial roll-out strategy, the devices will have to be configured consistently to support existing tariffs for billing.

Which is a valid consideration to determine the setup of device type administrative data for this implementation?

a) billing usage rules
b) the model number
c) the device’s date of manufacturer
d) valid head-end systems, valid device configuration types, and the electricity service type

A

Needs supporting data

d) valid head-end systems, valid device configuration types, and the electricity service type

42
Q

Throughout its lifecycle, an asset’s disposition changes as it is moved between locations and service statuses.

Which are valid asset dispositions?

a) Receiving; Installed; Storage; Retired
b) In Receipt; In Field; In Stores; Retired
c) In Receipt; Installed; In Stores; Retired
d) Receiving; In Field; Storage; Retired

43
Q

Which four statements correctly describe what a Service Agreement Type controls? (Choose four.)

a) It controls the Late Payment Charge Calculation Method.
b) It controls the Service Type to be billed.
c) It controls the valid Rates that can be applied to the service agreement type.
d) It controls debt age.
e) It controls where the bill is to be sent.

44
Q

Which three statements are true in relation to Financial Transaction creation algorithms? (Choose three.)

a) They control how the payoff balance is affected.
b) They control when a Financial Transaction is to be swept onto a bill.
c) They control how the General Ledger details are created as these must always exist against a Financial Transaction.
d) They control if and how the General Ledger entries are created.
e) They control how the current balance is affected.

45
Q

Which statement correctly describes the relation between a device and a measuring component?

a) A device configuration links a device only to interval channels.
b) Two measuring components on the same device should have the same Units of Measure (UOM).
c) A device should have only one measuring component type.
d) A device can have any combination of interval and/or scalar measuring components.

46
Q

Within the application, operational devices can be assets or components.

Which two statements are true about components? (Choose two.)

a) Components are attached to assets.
b) Components have a disposition that tracks their location and status.
c) Components can be installed at locations.
d) Components are not a class of assets.
e) Components can’t have specifications.

47
Q

There has been a meter exchange at a service point in the past year.

How many installation events exist for the service point for the past year?

a) Two
b) One
c) Four
d) None
e) Three

A

Needs confirmation
a) Two

48
Q

As part of the service order processing, the algorithm D1-CNSPINSDV (Connect SP and/or Install Device) determines if a specific activity needs to be created based on the state of the service point.

Based on the status of the service point, what can this algorithm create?

a) Device
b) Device Configuration
c) Smart Meter Command
d) Service Point

A

Needs Confirmation
Smart Meter Command

49
Q

How many service agreements are linked to a severance process?

a) all service agreements that are connected to the initiating overdue (over debt) process
b) One
c) any number defined by the business user
d) zero - accounts are linked to severance processes
e) all service agreements that are connected to the initiating collection process

A
50
Q

Which entity defines the type of collection process to start based on age of debt, amount of debt, and type of customer?

a) Debt Class
b) Customer Class
c) Collection Class Control (defines the debt class – type of debt) associated with collection process.
d) Collection Class
e) Collection Process Template

51
Q

Which configuration steps are required to derive loss-adjusted kWh on a measuring component based on a loss factor value related to a service point?

a) Configure a Service Point Characteristic Type and derivation algorithm, and then associate the algorithm to the Measuring Component Type and the characteristic value to the service point.

b) Configure an SQI and the derivation algorithm, and then associate the algorithm to the Measuring Component Type and SQI to the service point.

c) Configure a factor and derivation algorithm, and then associate the factor to the Measuring Component Type and the derivation algorithm to the service point.

d) Configure a factor and derivation algorithm, and then associate both to the Measuring Component Type and service point.

e) Configure a Service Point Characteristic Type, factor, derivation algorithm, and Service Quantity Identifier (SQI), and then associate the SQI and derivation algorithm to the Measuring Component Type and the characteristic value to the service point.

A

Needs validation

e) Configure a Service Point Characteristic Type, factor, derivation algorithm, and Service Quantity Identifier (SQI), and then associate the SQI and derivation algorithm to the Measuring Component Type and the characteristic value to the service point.

52
Q

For a customer to receive a Subscription communication, what must they have?

a) an active address contact preference
b) an active address type preference
c) an active person contact preference
d) an active account contact preference

53
Q

How do you ensure that specific Validation, Editing, and Estimation (VEE) rules are applied to estimated measurements?

a) by adding the VEE Group to the Device Configuration Type
b) by adding the estimation rules to the Manual Override VEE Group to the Measuring Component Type
c) by adding the VEE Group to the Device Type
d) by adding the VEE Group as the Fallback VEE Group for the appropriate VEE role

54
Q

Which statement supports usage transaction calculation?

a) Bill determinants are derived from the final measurements for only interval measuring components or devices installed at the usage subscription’s service points during the calculation period.
b) Bill determinants are derived from the initial measurement data of the measuring components devices installed at the usage subscription’s service points during calculation period.
c) Bill determinants are derived from the final measurements of the measuring components or devices installed at the usage subscription’s service points during the calculation period.
d) Bill determinants are derived from the initial measurement data of the measuring components installed at the usage subscription’s devices during the calculation period.

55
Q

How many bill segment-related financial transactions do pay plans have?

a) depends on the number of payments that is part of the pay plan
b) one
c) depends on the number of bills that will contain the customer’s pay plan commitments
d) none
e) Unlimited

A
56
Q

If a customer makes a payment for more than what is due for the account, which entity contains the logic for how this overpayment should be handled?

a) Tender Type
b) Installation Options
c) Customer Class
d) Pay Segment Type
e) Service Agreement Type

57
Q

Which two plug-in spots can call the rating functionality using base package-supplied algorithm types? (Choose two.)

a) Adjustment Type - Adjustment FT Creation
b) Billable Charge Template
c) Bill Segment Type - Bill Segment Create
d) Adjustment Type – Generate
e) Bill Segment Type - Bill Segment FT Creation

58
Q

When configuring the Get Scalar Details usage rule, which three attributes can be defined to retrieve scalar values? (Choose three.)

a) Unit of Measure
b) Device ID
c) Service Quantity Identifier
d) Time of Use
e) Service Point ID

59
Q

What Service Order activity types does the application include?

a) Start Service; Stop Service; Cut for Non-Payment; Reconnect Service for Payment; Exchange Meter; Move-In/Move-Out Service
b) Start Service; Stop Service; Install Meter; Remove Meter; Exchange Meter; Move-In/Move-Out Service
c) Enable Service; Disable Service; Install Meter; Remove Meter; Exchange Meter; Back-to-Back Service
d) Enable Service; Disable Service; Cut for Non-Payment; Reconnect Service for Payment; Exchange Meter; Back-to-Back Service

60
Q

Your client has the following requirements:

Many customers are installing their own solar electrical generation equipment. When these customers generate more electricity than required for their own use, the surplus can he exported back to the power grid.

In order to measure this generation, we have installed special scalar devices. These devices have separate registers to measure the energy generated (export) and the energy received (import) from the National Grid. Both reads will be stored in kWh, but the import is subtractive and export is consumptive.

What solution should you choose to configure the measuring component types for these specific requirements?

a) Create two service points: one for subtractive import and the other for consumptive export.
b) Create one new measuring component type for creating two measuring components (one for import and the other for export) that will be linked to one scalar device.
c) Create one new measuring component type for creating a new measuring component that will be linked to two different scalar devices (one for import and the other for export).
d) Create two new measuring component types (one for subtractive import and the other for consumptive export) to enable the creation of two measuring components that will be linked to one scalar device.

61
Q

Your client has installed scalar devices to measure the solar energy generated (Export) and the energy received (Import) from the National Grid. This data is stored in separate measuring components (registers).

The validation rules are generally the same for both measuring components, but there is one exception. The Negative Consumption check applies only to energy received (import).

Which two are possible configurations resulting in the Negative Consumption rule being checked for energy received (import) only? (Choose two.)

a) Modify the base VEE rule.
b) Remove the Negative Consumption check from the VEE group.
c) Create two different VEE groups.
d) Use Eligibility Criteria.
e) Use the Skip Flag in the VEE rule.

62
Q

Using a base-supplied algorithm type, what is payment distribution priority typically determined by?

a) Customer Class and Service Agreement Type
b) Payment Type + Debt Age
c) Debt Age
d) Service Agreement Type’s Priority and Debt Age
e) Customer Class and Debt Age

63
Q

You are configuring a VEE group to include rules to be executed when loading the initial measurement data (IMD).

What is the VEE group directly associated with?

a) Device Type and Measuring Component Type
b) Measuring Component Type
c) Device Type
d) Usage Type
e) Device Configuration Type

64
Q

What happens when a device’s measuring components are reconfigured (a new measuring component will be read) at a service point?

a) A device with a new configuration type is created.
b) The original installation event is updated with the ‘‘removal’’ (expire old device configuration).
c) A device with a new configuration type is created. Moreover, a new installation event is created to ‘install’’ (new device configuration).
d) The original installation event is updated with the ‘‘removal’’ (expire old device configuration) and a new installation event is created to ‘‘install’’ (new device configuration).
e) A new installation event is created to ‘‘install’’ (new device configuration).

65
Q

Which describes derived values and their relationship with Final Measurements?

a) Final Measurements can have multiple derived values, which represent other values for the same Final Measurement Date/Time.
b) Derived values can have multiple Final Measurements, which represent other values for the same Initial Measurement Date/Time.
c) Final Measurements can have one derived value, which represents an alternative for the same Final Measurement Date/Time.
d) Final Measurements can have one derived value, which represents the Initial Measurement for the same Final Measurement Date/Time.

66
Q

The base package usage transaction business object is represented by D2-UsageTransaction. The usage calculation engine or process drives the specifics of the usage to be calculated on this business object.

Based on this, which three configuration areas will have an impact on the usage calculation process? (Choose three.)

a) VEE rule
b) TOU map
c) Usage Rule
d) Factor Override

67
Q

Which three statements are true about usage subscriptions? (Choose three.)

a) A usage subscription can have either parent or child service points.
b) A usage subscription can be configured to include only a portion of a service point usage.
c) A usage subscription can have many service points.
d) Usage subscriptions are always related to an account.
e) A usage subscription can have only one service point.

68
Q

Critical validation rules verify the integrity of the initial measurement data (IMD). If an implementation needs to add new critical validations, where would you configure them?

a) as new lifecycle algorithms on the IMD Seeder BO (D1-IMDSeeder)
b) in the pre-processing algorithm of the IMD Seeder BO (Dl-IMDSeeder)
c) as options on the IMD Seeder BO (D1-IMDSeeder)
d) in the schema of the IMD Seeder BO (D1-IMDSeeder)
e) in the validation algorithm on the IMD Seeder BO (D1-IMDSeeder)